 2026

Spring update: Preparation and reinforcement work continues
Crews prepare for the concrete slab pour.

In January and February, enclosed scaffolding was installed around the building footprint in preparation for the pour of the concrete slab. Installation of the hydronic piping floor was completed. Crews continued installing reinforcing steel in preparation for the upcoming pour.

In March, crews poured the concrete slab and completed concrete cutting work.

Cured concrete in front of the visitor centre.

In April, the slab cured and insulated tarping was removed. Temporary scaffolding was taken down. The first lay of asphalt paving of the parking lot was completed.

In May, delivery and installation of the wooden “glulam” beams began, alongside framing of the exterior walls. Crews also poured concrete for the adjacent sidewalks and placed topsoil as part of the initial landscaping works.

 2025

Winter update: Site development advances for the new visitor, learning and community centre

In September, crews continued underground plumbing and electrical work, shaped the parking lot and entrance areas, and installed the driveway culvert, waste and recycling bins and new light standards.

Installation of hydronic heating lines being installed under the future flooring.

In October and November, the parking lot became more defined as grading was completed and new curbs were installed. Crews also placed insulation and radon barriers under the future floor and began installing the building’s hydronic heating lines and structural steel.

In December, the main hydronic line was installed and tested, and work continued on the remaining heating lines and reinforcing steel in preparation for the concrete slab pour.

Fall update: Construction of the new visitor, learning and community centre officially began

Construction of the new visitor, learning and community centre officially began in March 2025, following a meaningful gathering of Indigenous partners and collaborating artists. Tobacco offerings and the ashes of the Sacred Fire from this ceremony have been incorporated into the building’s foundations as a blessing for the site and the land upon which it sits.

Since March, utility connections and foundations have been completed, ongoing landscaping and grading works are transforming the site, and work on the building’s structure is underway. The centre is on track to welcome the public in 2027.

Spring update: Zoo Road Day Use Area and parking lot are closed
Closure signage at Zoo Road Day Use Area.

Zoo Road Day Use Area and parking lot are also closed to accommodate construction of the new visitor, learning and community centre. Parking is also not permitted along Zoo Road and will be enforced.

For more details, visit the bulletin: Zoo Road Day Use Area - Closed for construction