Jasper National Park Public Notices
Jasper National Park
Public notice
Approved development applications
Parks Canada is committed to ensuring that residents are informed about developments in their neighbourhood. For most types of development in Jasper National Park, Parks Canada requires the issuance of a development permit prior to any work commencing. A development permit confirms that the proposed project complies with Parks Canada’s policies and regulations, including the National Parks Act, the Regulations Respecting the Use of Land in Jasper, and Jasper’s Architectural Motif Guidelines, where applicable.
The following web archive lists all of the development permits issued in Jasper National Park since November 1, 2018, and is searchable by date, location, address, or project description. For questions on development in Jasper, please contact the Jasper Development Officer at 780-852-6223 or at jasperdevelopment@pc.gc.ca
Anyone interested in viewing the following projects may do so by making an appointment with the Jasper Development Officer.
Approved development applications
Date | Location | Address | Project description |
---|---|---|---|
2024-12-20 | Parcel U89 | Palisades Power Plant | Exterior renovation |
2024-12-18 | Block 21 Lot 22 | 895 Bonhomme Street | Exterior renovation |
2024-12-13 | Block 6 Lot 15 | Rockaboo Ice Wall | |
2024-12-16 | Parcel AG | Maligne Road | Building demolition |
2024-12-16 | Block 11 Lot BY & BZ | 702 Connaught Drive | Building demolition |
2024-12-17 | Whirlpool Campground | Demolition | |
2024-12-17 | Cavell Station | Demolition | |
2024-12-17 | Wapiti Campground | Demolition | |
2024-12-17 | Whistlers Campground | Demolition | |
2024-12-17 | Maligne Range | Demolition | |
2024-12-16 | Block 28 Lot 11 | 821 Turret Street | Building demolition |
2024-12-16 | Block 40 Lot 7 | 1218 Cabin Creek Drive | Building demolition |
2024-12-16 | Block 32 Lot 25&26 | 900-902 Geikie Street | Building demolition |
2024-12-16 | Block 12 Lot 17A | 717 Geikie Street | Building demolition |
2024-12-16 | Block 28 Lot 22 | 836 Geikie Street | Building demolition |
2024-12-16 | Block 20 Lot 1 | 701 Maligne Avenue | Building demolition |
2024-12-16 | Block 31 Lot 19 | 906 Patricia Street | Building demolition |
2024-12-16 | Block 31 Lot 18 | 908 Patricia Street | Building demolition |
2024-12-16 | Block 25 Lot 2&19 | 725 Geikie Street | Building demolition |
2024-12-16 | Block 25 Lot 13 | 730 Patricia Street | Building demolition |
2024-12-16 | Block 40 Lot 23 | 1138 Cabin Creek Drive | Building demolition |
2024-12-16 | Block 27 Lot 21 | 810 Patricia Street | Building demolition |
2024-12-05 | Block 12 Lot 5 | 709 Geikie Street | Building demolition |
2024-12-05 | Block 11 Lot 4 | 707 Patricia Street | Building demolition |
2024-12-12 | Block 39 Lot 17 | 1251 Cabin Creek Drive | Building demolition |
2024-12-12 | Block 39 Lot 16 | 1253 Cabin Creek Drive | Building demolition |
2024-12-12 | Block 39 Lot 15 | 1255 Cabin Creek Drive | Building demolition |
2024-12-12 | Block 39 Lot 14 | 1257 Cabin Creek Drive | Building demolition |
2024-12-12 | Block 40 Lot 76 | 10 Swift Crescent | Building demolition |
2024-12-12 | Block 40 Lot 78 | 8 Swift Crescent | Building demolition |
2024-12-12 | Block 40 Lot 77 | 9 Swift Crescent | Building demolition |
2024-12-12 | Block 40 Lot 79 | 7 Swift Crescent | Building demolition |
2024-12-12 | Block 40 Lot 85 | 1 Swift Crescent | Building demolition |
2024-12-12 | Block 40 Lot 84 | 2 Swift Crescent | Building demolition |
2024-12-12 | Block 40 Lot 83 | 3 Swift Crescent | Building demolition |
2024-12-12 | Block 40 Lot 82 | 4 Swift Crescent | Building demolition |
2024-12-12 | Block 40 Lot 81 | 5 Swift Crescent | Building demolition |
2024-12-12 | Block 40 Lot 80 | 6 Swift Crescent | Building demolition |
2024-12-12 | Block 40 Lot 31 | 1112 Cabin Creek Drive | Building demolition |
2024-12-12 | Block 41 Lot 22 | 7 Brewster Crescent | Building demolition |
2024-12-12 | Block 41 Lot 24 | 6 Brewster Crescent | Building demolition |
2024-12-12 | Block 28 Lot 33 | 814 Geikie Street | Building demolition |
2024-12-12 | Block 28 Lot 7 | 813 Turret Street | Building demolition |
2024-12-12 | Block 12 Lot 3 | 705 Geikie Street | Building demolition |
2024-12-12 | Block 27 Lot 10 | 819 Geikie Street | Building demolition |
2024-12-12 | Block 27 Lot 23 | 806 Patricia Street | Building demolition |
2024-12-12 | Block 27 Lot 9 | 817 Geikie Street | Building demolition |
2024-12-12 | Block 12 Lot 21 | 714 A&B Patricia Street | Building demolition |
2024-12-12 | Block 27 Lot 20 | 812 Patricia Street | Building demolition |
2024-12-12 | Block 28 Lot 32 | 816 Geikie Street | Building demolition |
2024-12-12 | Block 40 Lot 21 | 1142 Cabin Creek Drive | Building demolition |
2024-12-12 | Block 41 Lot 10 | 1214 Patricia Street | Building demolition |
2024-12-12 | Block 20 Lot 8 | 715 Maligne Avenue | Building demolition |
2024-12-12 | Block 24 Lot 5 | 723 Patricia Street | Building demolition |
2024-12-12 | Block 27 Lot 5 | 809 Geikie Street | Building demolition |
2024-12-12 | Block 27 Lot 19 | 814 Patricia Street | Building demolition |
2024-12-12 | Block 28 Lot 8 | 815 Turret Street | Building demolition |
2024-12-12 | Block 28 Lot 39,40 | 800/802 Geikie Street | Building demolition |
2024-12-12 | Block 28 Lot 31 | 818 Geikie Street | Building demolition |
2024-12-12 | Block 28 Lot 30 | 820 Geikie Street | Building demolition |
2024-12-12 | Block 40 Lot 21 | 1228 Cabin Creek Drive | Building demolition |
2024-12-12 | Block 41 Lot 19 | 1108 Patricia Street | Building demolition |
2024-12-12 | Block 45 Lot 63 | 1037 Lodgepole Street | Building demolition |
2024-12-06 | Parcel GL | 1 Old Lodge Road | Interior renovation |
2024-12-05 | Block 28 Lot 24 | 832 Geikie Street | Building demolition |
2024-12-05 | Block 28 Lot 23 | 834 Geikie Street | Building demolition |
2024-12-05 | Block 40 Lot 66 | 1124 Cabin Creek Drive | Building demolition |
2024-12-05 | Block 40 Lot 60 | 1219 Patricia Street | Building demolition |
2024-12-05 | Block 44 Lot 78 | 1014 Lodgepole Street | Building demolition |
2024-12-05 | Block 28 Lot 38 | 804 Geikie Street | Building demolition |
2024-12-05 | Block 28 Lot 37 | 806 Geikie Street | Building demolition |
2024-12-05 | Block 12 Lot 10 | 712 Patricia Street | Building demolition |
2024-12-06 | Block 21 Lot 13 | 812 Miette Avenue | Building demolition |
2024-12-05 | Block S Lot 55 | 2 Stan Wright Drive | Building demolition |
2024-12-05 | Block S Lot 54 | 32 Stan Wright Drive | Building demolition |
2024-12-10 | Block 14 Lot 28 | 100 Patricia Street | Exterior renovation |
2024-12-09 | Parcel FX Unit 6 | 315 Willow Avenue | Interior renovation |
2024-12-05 | Block 11 Lot 5 | 709 Patricia Street | Building demolition |
2024-12-05 | Block 12 Lot 12 | 708 Patricia Street | Building demolition |
2024-12-05 | Block 20 Lot 15 | 712 Miette Avenue | Building demolition |
2024-12-05 | Block 20 Lot 5 | 709 Maligne Avenue | Building demolition |
2024-12-05 | Block 20 Lot 6 | 711 Maligne Avenue | Building demolition |
2024-12-05 | Block 20 Lot 20,21 | 700/702 Maligne Avenue | Building demolition |
2024-12-05 | Block 20 Lot 19 | 704 Miette Avenue | Building demolition |
2024-12-05 | Block 21 Lot 12 | 814 Miette Avenue | Building demolition |
2024-12-05 | Block 22 Lot 1,2 | 701 Miette Avenue | Building demolition |
2024-12-05 | Block 22 Lot 14 | 716 Tonquin Street | Building demolition |
2024-12-05 | Block 24 Lot 4 | 721 Patricia Street | Building demolition |
2024-12-05 | Block 25 Lot 15 | 726 Patricia Street | Building demolition |
2024-12-05 | Block 25 Lot 14 | 728 Patricia Street | Building demolition |
2024-12-05 | Block 25 Lot 12 | 732 Patricia Street | Building demolition |
2024-12-05 | Block 27 Lot 25 | 802 Patricia Street | Building demolition |
2024-12-05 | Block 27 Lot 24 | 804 Patricia Street | Building demolition |
2024-12-05 | Block 28 Lot 21 | 838 Geikie Street | Building demolition |
2024-12-05 | Block 28 Lot 28 | 824 Geikie Street | Building demolition |
2024-12-05 | Block 28 Lot 18,19 | 835/837 Turret Street | Building demolition |
2024-12-05 | Block 38 Lot 3 | 1121 Cabin Creek Drive | Building demolition |
2024-12-05 | Block 39 Lot 25A/24B | 1235 Cabin Creek Drive | Building demolition |
2024-12-05 | Block 39 Lot 35A,34B | 1215 Cabin Creek Drive | Building demolition |
2024-12-05 | Block 40 Lot 37 | 1100 Cabin Creek Drive | Building demolition |
2024-12-05 | Block 40 Lot 69 | 1118 Cabin Creek Drive | Building demolition |
2024-12-05 | Block 40 Lot 68 | 1120 Cabin Creek Drive | Building demolition |
2024-12-05 | Block 40 Lot 65 | 1126 Cabin Creek Drive | Building demolition |
2024-12-05 | Block 40 Lot 64 | 1128 Cabin Creek Drive | Building demolition |
2024-12-05 | Block 40 Lot 24 | 1136 Cabin Creek Drive | Building demolition |
2024-12-05 | Block 40 Lot 45 | 1115 Patricia Street | Building demolition |
2024-12-05 | Block 40 Lot 47 | 1119 Patricia Street | Building demolition |
2024-12-05 | Block 40 Lot 49 | 1123 Patricia Street | Building demolition |
2024-12-05 | Block 40 Lot 50 | 1125 Patricia Street | Building demolition |
2024-12-05 | Block 40 Lot 58 | 1215 Patricia Street | Building demolition |
2024-12-05 | Block 44 Lot 90 | 1002 Lodgepole Street | Building demolition |
2024-12-05 | Block 41 Lot 25 | 5 Brewster Crescent | Building demolition |
2024-12-05 | Block 41 Lot 20 | 1106 Patricia Street | Building demolition |
2024-12-05 | Block 41 Lot 17 | 1112 Patricia Street | Building demolition |
2024-12-05 | Block 41 Lot 16 | 1114 Patricia Street | Building demolition |
2024-12-05 | Block 44 Lot 17 | 1021 Bonhomme street | Building demolition |
2024-12-05 | Block 44 Lot 84 | 1008 Lodgepole Street | Building demolition |
2024-12-05 | Block 44 Lot 68 | 1028 Lodgepole Street | Building demolition |
2024-12-05 | Block 44 Lot 75 | 1020 Lodgepole Street | Building demolition |
2024-12-05 | Block 44 Lot 77 | 1016 Lodgepole Street | Building demolition |
2024-12-05 | Block 44 Lot 72 | 1024 Lodgepole Street | Building demolition |
2024-12-05 | Block 44 Lot 62 | 1034 Lodgepole Street | Building demolition |
2024-12-05 | Block 44 Lot 48 | 1009 Poplar Avenue | Building demolition |
2024-12-05 | Block 40 Lot 38 | 1101 Patricia Street | Building demolition |
2024-12-05 | Block 11 Lot BU | 715 Patricia Street | Building demolition |
2024-12-05 | Block 22 Lot 12 | 720 Tonquin Street | Building demolition |
2024-12-05 | Block 12 Lot 6 | 711 Geikie Street | Building demolition |
2024-12-05 | Block 40 Lot 44 | 1113 Patricia Street | Building demolition |
2024-12-05 | Block 12 Lot 8 | 715 Geikie Street | Building demolition |
2024-12-05 | Block 31 Lot 20 | 904 Patricia Street | Building demolition |
2024-12-05 | Block 24 Lot 2 | 717 Patricia Street | Building demolition |
2024-12-05 | Block 11 Lot 3 | 705 Patricia Street | Building demolition |
2024-12-05 | Block 12 Lot 15 | 702 Patricia Street | Building demolition |
2024-12-08 | Block 26 Lot 9 | 817 Patricia Street | Interior renovations |
2024-12-03 | Block 35 Lot 31 | 11 Aspen Crescent | Interior renovations |
2024-12-02 | Block 28 Lot 29 | 822 Geikie Street | Exterior renovation |
2024-12-02 | Block 40 Lot 42 | 1109 Patricia Street | Building demolition |
2024-11-29 | Block 44 Lot 51 | 1003 Poplar Avenue | Building demolition |
2024-11-29 | Block 44 Lot 46 | 1013 Poplar Avenue | Building demolition |
2024-11-29 | Block 44 Lot 44 | 1015 Poplar Avenue | Building demolition |
2024-11-29 | Block 44 Lot 21 | 1013 Bonhomme Street | Building demolition |
2024-11-29 | Block 44 Lot 20 | 1015 Bonhomme Street | Building demolition |
2024-11-29 | Block 44 Lot 18 | 1019 Bonhomme Street | Building demolition |
2024-11-29 | Block 44 Lot 16 | 1023 Bonhomme Street | Building demolition |
2024-11-29 | Block 44 Lot 88 | 1004 Lodgepole Street | Building demolition |
2024-11-29 | Block 44 Lot 86 | 1006 Lodgepole Street | Building demolition |
2024-11-29 | Block 44 Lot 80 | 1012 Lodgepole Street | Building demolition |
2024-11-29 | Block 44 Lot 76 | 1018 Lodgepole Street | Building demolition |
2024-11-29 | Block 44 Lot 70 | 1026 Lodgepole Street | Building demolition |
2024-11-29 | Block 45 Lot 71 | 1029 Lodgepole Street | Building demolition |
2024-11-29 | Block 44 Lot 66 | 1030 Lodgepole Street | Building demolition |
2024-11-29 | Block 45 Lot 69 | 1031 Lodgepole Street | Building demolition |
2024-11-29 | Block 45 Lot 65 | 1035 Lodgepole Street | Building demolition |
2024-11-29 | Block 44 Lot 60 | 1036 Lodgepole Street | Building demolition |
2024-11-29 | Block 45 Lot 61 | 1039 Lodgepole Street | Building demolition |
2024-11-29 | Block 25 Lot 3 | 727 Geikie Street | Building demolition |
2024-11-25 | Block 14 Lot 7 | 113 Geikie Street | Exterior renovation |
2024-11-22 | Parcel C, D | Exterior renovation | |
2024-11-20 | Block 44 Lot 91 | 1007 Bonhomme Street | Building demolition |
2024-11-19 | Block 28 Lot 6 | 811 Turret Street | Building demolition |
2024-11-14 | Block 39 Lot 21 | 1243 Cabin Creek Drive | Building demolition |
2024-11-14 | Block 39 Lot 20 | 1245 Cabin Creek Drive | Building demolition |
2024-11-14 | Block 39 Lot 19 | 1247 Cabin Creek Drive | Building demolition |
2024-11-14 | Block 39 Lot 18 | 1249 Cabin Creek Drive | Building demolition |
2024-11-14 | Block 39 Lot 26,27 | 1231 Cabin Creek Drive | Building demolition |
2024-11-14 | Block 39 Lot 29 | 1227A Cabin Creek Drive | Building demolition |
2024-11-14 | Block 39 Lot 28 | 1227B Cabin Creek Drive | Building demolition |
2024-11-15 | Block 39 Lot 30,31 | 1223 Cabin Creek Drive | Building demolition |
2024-11-15 | Block 40 Lot 6 | 1220 Cabin Creek Drive | Building demolition |
2024-11-15 | Block 40 Lot 30 | 1114 Cabin Creek Drive | Building demolition |
2024-11-15 | Block 40 Lot 29 | 1116 Cabin Creek Drive | Building demolition |
2024-11-15 | Block 40 Lot 33 | 1108 Cabin Creek Drive | Building demolition |
2024-11-15 | Block 40 Lot 35 | 1104 Cabin Creek Drive | Building demolition |
2024-11-15 | Block 40 Lot 34 | 1106 Cabin Creek Drive | Building demolition |
2024-11-15 | Block 40 Lot 7 | 1218 Cabin Creek Drive | Building demolition |
2024-11-15 | Block 40 Lot 57 | 1213 Patricia Street | Building demolition |
2024-11-15 | Block 41 Lot 3 | 1228 Patricia Street | Building demolition |
2024-11-15 | Block 41 Lot 2 | 1230 Patricia Street | Building demolition |
2024-11-15 | Block 41 Lot 1 | 1232 Patricia Street | Building demolition |
2024-11-15 | Bock 41 Lot 15 | 1116 Patricia Street | Building demolition |
2024-11-15 | Block 41 Lot 14 | 1118 Patricia Street | Building demolition |
2024-11-15 | Block 41 Lot 12 | 1210 Patricia Street | Building demolition |
2024-11-15 | Block 41 Lot 11 | 1212 Patricia Street | Building demolition |
2024-11-15 | Block 44 Lot 50 | 1005 Poplar Avenue | Building demolition |
2024-11-15 | Block 44 Lot 49 | 1007 Poplar Avenue | Building demolition |
2024-11-15 | Block 20 Lot 2 | 703 Maligne Avenue | Building demolition |
2024-11-15 | Block 20 Lot 3 | 705 Maligne Avenue | Building demolition |
2024-11-15 | Block 21 Lot 18,19 | 800/802 Miette Avenue | Building demolition |
2024-11-15 | Block 21 Lot 17 | 804 Miette Avenue | Building demolition |
2024-11-15 | Block 21 Lot 16 | 806 Miette Avenue | Building demolition |
2024-11-15 | Block 21 Lot 15 | 808 Miette Avenue | Building demolition |
2024-11-15 | Block 20 Lot 17 | 708 Miette Avenue | Building demolition |
2024-11-15 | Block 20 Lot 16 | 710 Miette Avenue | Building demolition |
2024-11-15 | Block 20 Lot 14 | 714 Miette Avenue | Building demolition |
2024-11-15 | Block 20 Lot 13 | 716 Miette Avenue | Building demolition |
2024-11-15 | Block 27 Lot 3 | 805 Geikie Street | Building demolition |
2024-11-15 | Block 27 Lot 4 | 807 Geikie Street | Building demolition |
2024-11-15 | Block 27 Lot 26 | 800 Patricia Street | Building demolition |
2024-11-15 | Block 27 Lot 6 | 811 Geikie Street | Building demolition |
2024-11-15 | Block 27 Lot 8 | 815 Geikie Street | Building demolition |
2024-11-15 | Block 27 Lot 23 | 806 Patricia Street | Building demolition |
2024-11-15 | Block 31 Lot 16 | 912 Patricia Street | Building demolition |
2024-11-15 | Block 31 Lot 15 | 914 Patricia Street | Building demolition |
2024-11-15 | Block 31 Lot 14 | 916 Patricia Street | Building demolition |
2024-11-15 | Block 27 Lot 16 | 820 Patricia Street | Building demolition |
2024-11-15 | Block 27 Lot 15 | 822 Patricia Street | Building demolition |
2024-11-15 | Block 23 Lot 25 | 724A Patricia Street | Building demolition |
2024-11-15 | Block 23 Lot 25 | 724B Patricia Street | Building demolition |
2024-11-15 | Parcel BW | 711A Patricia Street | Building demolition |
2024-11-15 | Parcel BW | 711A Patricia Street | Building demolition |
2024-11-15 | Parcel BV | 713 Patricia Street | Building demolition |
2024-11-15 | Parcel BX | 706 Connaught Drive | Building demolition |
2024-11-15 | Parcel CV-1 U36 | 1 Patricia Place | Building demolition |
2024-11-15 | Parcel CV-1 U35 | 3 Patricia Place | Building demolition |
2024-11-15 | Parcel CV-1 U34 | 5 Patricia Place | Building demolition |
2024-11-15 | Parcel CV-1 U33 | 7 Patricia Place | Building demolition |
2024-11-15 | Parcel CV-1 U32 | 9 Patricia Place | Building demolition |
2024-11-15 | Parcel CV-1 U31 | 11 Patricia Place | Building demolition |
2024-11-15 | Parcel CV-1 U11 | 22 Patricia Place | Building demolition |
2024-11-15 | Parcel CV-1 U12 | 24 Patricia Place | Building demolition |
2024-11-15 | Parcel CV-1 U13 | 26 Patricia Place | Building demolition |
2024-11-15 | Parcel CV-1 U14 | 28 Patricia Place | Building demolition |
2024-11-15 | Parcel CV-1 U15 | 30 Patricia Place | Building demolition |
2024-11-15 | Parcel CV-1 U16 | 32 Patricia Place | Building demolition |
2024-11-14 | Parcel U65 | Building demolition | |
2024-11-13 | Block 35 Lot 34 | 17 Aspen Crescent | Interior renovation |
2024-11-13 | Parcel U64 | Building demolition | |
2024-11-12 | Block 40 Lot 43 | 1111 Patricia Street | Building demolition |
2024-11-12 | Block 2 Lot 5 | 209 Geikie Street | Two-unit dwelling and two secondary suites |
2024-11-07 | Out-of-Town Parks Canada Assets | Building demolition | |
2024-11-07 | In-Town Parks Canada Assets | Building demolition | |
2024-11-06 | Block R9, Lot 1 | 720 Geikie Street | Building demolition |
2024-11-06 | Block 28, Lot 3 | 805 Turret Street | Building demolition |
2024-11-06 | Block 28, Lot 4 | 807 Turret Street | Building demolition |
2024-11-06 | Block 28, Lot 5 | 809 Turret Street | Building demolition |
2024-11-06 | Block 28, Lot 6 | 811 Turret Street | Building demolition |
2024-11-06 | Block 28, Lot 34 | 812 Geikie Street | Building demolition |
2024-11-06 | Block 28, Lot 27 | 826 Geikie Street | Building demolition |
2024-11-06 | Block 28, Lot 26 | 828 Geikie Street | Building demolition |
2024-11-06 | Block 28, Lot 25 | 830 Geikie Street | Building demolition |
2024-11-05 | Block 40 Lot 18 | 1146 Cabin Creek Drive | Building demolition |
2024-11-05 | Block 40 Lot 17 | 1148 Cabin Creek Drive | Building demolition |
2024-11-05 | Block 40 Lot 51 | 1201 Patricia Street | Building demolition |
2024-11-05 | Block 41 Lot 29 | 1 Brewster Crescent | Building demolition |
2024-11-05 | Block 41 Lot 28 | 2 Brewster Crescent | Building demolition |
2024-11-05 | Block 41 Lot 21 | 8 Brewster Crescent | Building demolition |
2024-11-05 | Block 40 Lot 39 | 1103 Patricia Street | Building demolition |
2024-11-05 | Block 40 Lot 40 | 1105 Patricia Street | Building demolition |
2024-11-05 | Block 40 Lot 41 | 1107 Patricia Street | Building demolition |
2024-11-05 | Block 41 Lot 9 | 1216 Patricia Street | Building demolition |
2024-11-05 | Block 41 Lot 8 | 1218 Patricia Street | Building demolition |
2024-11-05 | Block 41 Lot 7 | 1220 Patricia Street | Building demolition |
2024-11-05 | Block 41 Lot 6 | 1222 Patricia Street | Building demolition |
2024-11-05 | Block 41 Lot 5 | 1224 Patricia Street | Building demolition |
2024-11-05 | Block 40 Lot 53 | 1205 Patricia Street | Building demolition |
2024-11-05 | Block 40 Lot 54 | 1207 Patricia Street | Building demolition |
2024-11-05 | Block 40 Lot 55 | 1209 Patricia Street | Building demolition |
2024-11-05 | Block 40 Lot 9 | 1214 Cabin Creek Drive | Building demolition |
2024-11-05 | Block 40 Lot 5 | 1222 Cabin Creek Drive | Building demolition |
2024-11-05 | Block 40 Lot 4 | 1224 Cabin Creek Drive | Building demolition |
2024-11-05 | Block 40 Lot 3 | 1226 Cabin Creek Drive | Building demolition |
2024-11-05 | Block 40 Lot 59 | 1217 Patricia Street | Building demolition |
2024-11-04 | Parcel A | Exterior renovation | |
2024-11-01 | Parcel GH | 708 Sleepy Hollow Road | Building demolition |
2024-11-01 | Parcel U76 | Big Shovel Pass | Building demolition |
2024-10-31 | Block 31 Lot 1-4 | 901 Geikie Street | Building demolition |
2024-10-31 | Block 25 Lot 4 | 729 Geikie Street | Building demolition |
2024-10-31 | Block 25 Lot 5 | 731 Geikie Street | Building demolition |
2024-10-31 | Block 25 Lot 6-7 & 18 | 733 Geikie Street | Building demolition |
2024-10-31 | Block 25 Lot 10 | 736 Patricia Street | Building demolition |
2024-10-31 | Block 25 Lot 8 & 9 | 738 Patricia Street | Building demolition |
2024-10-30 | Block 44 Lot 82 | 1010 Lodgepole Street | Building demolition |
2024-10-29 | Block 41 Lot 4 | 1226 Patricia Street | Building demolition |
2024-10-24 | Block 40 Lot 10 | 1212 Cabin Creek Drive | Building demolition |
2024-10-24 | Block 22 Lot 4 | 707 Miette Avenue | Building demolition |
2024-10-24 | Block 22 Lot 5 | 709 Miette Avenue | Building demolition |
2024-10-24 | Block 22 Lot 6 | 711 Miette Avenue | Building demolition |
2024-10-24 | Block 22 Lot 7 | 713 Miette Avenue | Building demolition |
2024-10-24 | Block 22 Lot 8 | 715 Miette Avenue | Building demolition |
2024-10-24 | Block 23 Lot 1 and 2 | 801 and 803 Miette Avenue | Building demolition |
2024-10-24 | Block 23 Lot 3 | 805 Miette Avenue | Building demolition |
2024-10-24 | Block 23 Lot 4 | 807 Miette Avenue | Building demolition |
2024-10-24 | Block 23 Lot 5 | 809 Miette Avenue | Building demolition |
2024-10-24 | Block 23 Lot 6 | 811 Miette Avenue | Building demolition |
2024-10-24 | Block 23 Lot 7 | 813 Miette Avenue | Building demolition |
2024-10-24 | Block 23 Lot 8 | 815 Miette Avenue | Building demolition |
2024-10-23 | Parcel CU-1 | 1006 Patricia Street | Apartment |
2024-10-22 | Parcel FY | 1040 Patricia Street | Building demolition |
2024-10-22 | Parcel FY | 1038 Patricia Street | Building demolition |
2024-10-22 | Parcel FY | 1036 Patricia Street | Building demolition |
2024-10-22 | Parcel FY | 1034 Patricia Street | Building demolition |
2024-10-22 | Parcel FY | 1032 Patricia Street | Building demolition |
2024-10-22 | Parcel FY | 1030 Patricia Street | Building demolition |
2024-10-22 | Parcel FY | 1028 Patricia Street | Building demolition |
2024-10-22 | Parcel FY | 1026 Patricia Street | Building demolition |
2024-10-22 | Block 40 Lot 16 | 1200 Cabin Creek Drive | Building demolition |
2024-10-22 | Block 40 Lot 15 | 1202 Cabin Creek Drive | Building demolition |
2024-10-22 | Block 40 Lot 14 | 1204 Cabin Creek Drive | Building demolition |
2024-10-22 | Block 40 Lot 13 | 1206 Cabin Creek Drive | Building demolition |
2024-10-22 | Block 40 Lot 12 | 1208 Cabin Creek Drive | Building demolition |
2024-10-22 | Block 40 Lot 11 | 1210 Cabin Creek Drive | Building demolition |
2024-10-21 | Block 20 Lot 1 | 701 Maligne Avenue | Building demolition |
2024-10-17 | Block 32 Lot 19-24 | 910 and 904 Geikie Street | Building demolition |
2024-10-17 | Parcel GL | 1 Old Lodge Road | Event tent |
2024-10-16 | Block 25 Lot 11 | 734 Patricia Street | Building demolition |
2024-10-16 | Block 28 Lot 10 | 819 Turret Street | Building demolition |
2024-10-16 | Block 28 Lot 9 | 817 Turret Street | Building demolition |
2024-10-16 | Block 28 Lot 35 | 810 Geikie Street | Building demolition |
2024-10-16 | Block 28 Lot 36 | 808 Geikie Street | Building demolition |
2024-10-16 | Block 41 Lot 27 | 3 Brewster Crescent | Building demolition |
2024-10-16 | Parcel HH HF HK and GA | Accessory building and Landscaping | |
2024-10-15 | Block 27 Lot 22 | 808 Patricia Street | Building demolition |
2024-10-11 | Block 30 Lot 6-16 | 912 Connaught Drive | Building demolition |
2024-10-10 | Block S Parcel CK | 43 Stan Wright Drive | Exterior renovation |
2024-10-10 | Block 43 Lot 35 | 1024 Poplar Avenue | Building demolition |
2024-10-09 | Block 5 Lot 2 | 405 Patricia Street | Sign |
2024-10-09 | Block 5 Lot 2 | 405 Patricia Street | Interior renovation |
2024-10-08 | Block S Lot 56 | 60 Stan Wright Drive | Building demolition |
2024-10-07 | Block 27 Lot 10 | 819 Geikie Street | Building demolition |
2024-10-07 | Block 14 Lot 14A | 120 Patricia Street | Exterior renovation |
2024-10-07 | Block 30 Lot 1-5, 17-21 | 900 Connaught Drive | Building demolition |
2024-10-04 | Parcel U83 | Exterior renovation | |
2024-10-04 | Parcel CL | 701 Connaught Drive | Building demolition |
2024-10-04 | Bloc 7 Lot 2, 3, 4 | 601 Patricia Street | Exterior renovation and building addition |
2024-10-04 | Parcel AC | 706 Sleepy Hollow Road | Building demolition |
2024-10-03 | Block 31 Lot 5-11 | 909 Geikie Street | Building demolition |
2024-10-02 | Block 10 Lot 15 | 610 Patricia Street | Building demolition |
2024-10-01 | Block 36 Lot 6 | 509 Turret Street | Exterior renovation |
2024-10-01 | Block 10 Lot 2 | #2 Lake Edith | Building demolition |
2024-10-01 | Block 10 Lot 1 | #1 Lake Edith | Building demolition |
2024-09-27 | Block 16 Lot 17 | 231 Bonhomme Street | Exterior renovation |
2024-09-26 | Block 11 Lot 1 | 103 Hazel Avenue | Building demolition |
2024-09-26 | Block 9 Lot 23 | 624 Connaught Drive | Building demolition |
2024-09-26 | Parcel CG | 76 Connaught Drive | Interior renovation and exterior renovation |
2024-09-23 | Miette Hot Springs | Interior renovation and exterior renovation | |
2024-09-20 | Block 14 Lot 16 | 116 Patricia Street | Exterior renovation |
2024-09-19 | Parcel U96 | Decoigne Road | Utility services |
2024-09-19 | Parcel H | Beckers Chalet | Building demolition |
2024-09-19 | Parcel AF | Jasper House Bungalows | Building demolition |
2024-09-19 | Parcel HB | Tekarra Resort | Building demolition |
2024-09-19 | Parcel M | Alpine Village | Building demolition |
2024-09-19 | Parcel GL | 1 Old Lodge Road | Building demolition |
2024-09-13 | Parcel GS | 1 Marmot Basin Road | Utility services |
2024-09-11 | Parcel HB | Tekerra Resort | Utility services |
2024-09-04 | Block 2 Lots 5, 6 | 211 Geikie Street | Two-Unit Dwelling and Two Secondary Suites |
2024-09-03 | Block 5 Lot 16 | 401 Patricia Street | Exterior renovation |
2024-07-22 | Parcel CN, CO, CP | 36-230 Bonhomme Street | Fence |
2024-07-19 | Block 9 Lots 9-13 | 627. 629, 631 Patricia Street | Exterior renovation |
2024-07-18 | Block 27 Lot 11 | 821 Geikie Street | Exterior renovation |
2024-07-16 | Parcel AL & AZ | 96 Geikie Street | Interior renovation |
2024-07-09 | Parcel U123 | 500 Connaught Drive | Exterior renovation |
2024-07-09 | Block 40 Lot 43 | 1111 Patricia Street | Exterior renovation and building addition |
2024-07-08 | Block 14 Lot 27 | 102A Patricia Street | Garage suite |
2024-07-08 | Block 10 Lot 1 | 603B Geikie Street | Fence |
2024-07-02 | Block 28 Lot 21 | 838 Geikie Street | Exterior renovation |
2024-06-26 | Block 40 Lot 11 | 1210 Cabin Creek Drive | Deck |
2024-06-26 | Block 9 Lot 3 | #29 Lake Edith | Septic tank |
2024-06-24 | Block 39 Lot 48 | 62 Stone Mountain Village | Discretionary use |
2024-06-21 | Block 28 Lot 35 | 810 Geikie Street | Exterior renovation |
2024-06-21 | Parcel HG | 74 Connaught Drive | Royal Canadian Mounted Police detachment |
2024-06-19 | Parcel U135 | Maligne Lake | Dock |
2024-06-19 | Block 16 Lot 1 | 311 Aspen Ave | Interior renovation |
2024-06-18 | Block 101 Lot 1 | 9 Patricia Circle | Fence |
2024-06-17 | Bloc 35 Lot 38 | 25 Aspen Crescent | Private home accommodation |
2024-06-12 | Block 40 Lot 44 | 1113 Patricia Street | Deck |
2024-06-12 | Block 7 Lot 11 | 604 Connaught Drive | Sign |
2024-06-11 | Block 2 Lot 21 | 201 Geikie Street | Patio |
2024-06-11 | Block 42 Lot 36 | 1019 Poplar Avenue | Fence |
2024-06-10 | Parcel CV-2 | 10-1019 Patricia Street | Fence |
2024-06-06 | Parcel CV-2 | 7-1001 Patricia Street | Fence |
2024-06-05 | Block 40 Lot 85 | #1 Swift Crescent | Discretionary use |
2024-06-05 | Block 42 Lot 59 | 201 Ash Avenue | Fence |
2024-06-03 | Block 7 Lot 10 | 606 Connaught Drive | Fence |
2024-05-27 | Block S Lot 21 | 53 Stan Wright Drive | Discretionary use |
2024-05-24 | Block 10 Lot 11 | 618 Patricia Street | Interior renovation |
2024-05-21 | Block 1 Lot 9 | 217 Patricia Street | Exterior renovation |
2024-05-17 | Parcel HG | 74 Connaught Drive | Sign |
2024-05-16 | Parcel HB | Tekarra Lodge | Exterior renovation |
2024-05-15 | Block 39 Lots 36, 37 | 1211 Cabin Creek Drive | Interior renovation and exterior renovation |
2024-05-15 | Parcel U83 | Columbia Icefield Area and the Athabasca Glacier | Accessory building |
2024-05-10 | Block 5 Lot 11 | 408 Connaught Drive | Sign |
2024-05-09 | Block 39 Lot 48 | 28 Stone Mountain Village | Discretionary use |
2024-05-08 | Parcel GK | Pine Bungalows | Interior renovation |
2024-05-07 | Block 14 Lot 27 | 102B Patricia Street | Private home accommodation |
2024-05-07 | Block 14 Lot 27 | 102A Patricia Street | Private home accommodation |
2024-05-03 | Parcel CU-1 | 1002 Patricia Street | Discretionary use |
2024-05-03 | Parcel FW | 1036 Bonhomme Street | Fence |
2024-05-01 | Block 15 Lot 17 | 104 Geikie Street | Fence |
2024-04-30 | Block R5 | 520 Turret Street | Event tent |
2024-04-24 | Block 20 Lot 3 | 15 Lake Edith | Interior renovation and exterior renovation |
2024-04-23 | Block 35 Lot 31 | 11 Aspen Crescent | Interior renovation, exterior renovation and secondary suite |
2024-04-23 | Block 40 Lot 11 | 1210 Cabin Creek Drive | Secondary suite |
2024-04-22 | Block 20 Lot 10 | 719 Maligne Avenue | Accessory building |
2024-04-18 | Block 32 Lot 18 | 300 Willow Avenue | Home based businesses |
2024-04-17 | Block S Lot 21 | 53 Stan Wright Drive | Interior renovation |
2024-04-16 | Block 14 Lot 17 | 114 Patricia Street | Exterior renovation |
2024-04-11 | Block 2 Lot 4 | 707 Miette Avenue | Exterior renovation |
2024-04-10 | Block 23 Lot 3 | 805 Miette Avenue | Exterior renovation |
2024-04-05 | Block 9 Lot 28 | 614 Connaught Drive | Sign |
2024-04-03 | Parcel CG | 76 Connaught Drive | Interior renovation |
2024-04-02 | Block S Lot 7 | 29 Stan Wright Drive | Sign |
2024-03-25 | Highway 93A | Staff work camp | |
2024-03-13 | Sixth Bridge | Utility services | |
2024-03-02 | Block 1 Lot 7 | 44 Lake Edith | Accessory building and landscaping |
2024-02-29 | Parcel J | 102 Bonhomme Street | Commercial accommodation |
2024-02-19 | Block 35 Lot 38 | 25 Aspen Crescent | Exterior renovation and secondary suite |
2024-02-19 | Parcel U | Pyramid Lake Road | Landscaping and exterior renovation |
2024-02-16 | Block 26 Lot 9 | 817 Patricia Street | Interior renovation |
2024-02-16 | Parcel FN | Columbia Icefield Area and the Athabasca Glacier | Exterior renovation |
2024-02-12 | Parcel CN, CO, CP | 23-230 Bonhomme Street | Exterior renovation |
2024-02-02 | Block 5 Lot 11 | 408 Connaught Drive | Exterior renovation |
2024-02-02 | Parcel BS | Paddock #13, Cottonwood Corral Association | Horse shelter renovation |
2024-02-01 | Parcel FT | 518 Geikie Street | Interior renovation |
2024-01-31 | Block 40 Lot 10 | 1212 Cabin Creek Drive | Exterior renovation |
2024-01-25 | Parcel AL & AZ | 96 Geikie Street | Sign |
2024-01-22 | Block 39 Lot 32 & 33 | 1219A Cabin Creek Drive | Interior renovation |
2024-01-17 | Block S Lot 54 | 32 Stan Wright Drive | Discretionary use |
2024-01-15 | Block 40 Lot 38 | 1101 Patricia Street | Exterior renovation |
2024-01-11 | Block R5 | 520 Turret Street | Landscaping |
2024-01-10 | Block 28 Lot 24 | 832 Geikie Street | Exterior renovation |
2024-01-09 | Town of Jasper | Streets, sidewalks, open spaces | Utility services |
2024-01-09 | Block 42 Lot 54 | 209 Ash Avenue | Exterior renovation |
2024-01-08 | Parcel H | Exterior renovation | |
2024-01-08 | Block 21 Lot 20 | 811 Maligne Avenue | Secondary suite |
2024-01-05 | Block 40 Lot 24 | 1136 Cabin Creek Drive | Secondary suite |
2024-01-04 | Block 34 Lot 5 | 909 Bonhomme Street | Home based business |
2023-12-28 | Block 13 Lot 19 | 110 Connaught Drive | Landscaping |
2023-12-22 | Block 35 Lot 15 | 204 Bonhomme Street | Interior renovation |
2023-12-20 | Parcel GL | 1 Old Lodge Road | Landscaping |
2023-12-20 | Block 44 Lot 17 | 1021 Bonhomme Street | One-unit dwelling |
2023-12-20 | Parcel AK | 94 Geikie Street | Exterior renovation |
2023-12-20 | Block 16 Lot 38 | 206 Colin Crescent | Interior renovation |
2023-12-18 | Block 20 Lot 11 | 720 Miette Avenue | Secondary suite |
2023-12-13 | Block 7 Lot 8 | 610 Connaught Drive | Sign |
2023-12-12 | Block 42 Lot 26 | 1031 Poplar Avenue | One-unit dwelling and secondary suite |
2023-12-12 | Block R5 | 520 Turret Street | Event tent |
2023-12-08 | Wabasso Campground | Utility services | |
2023-12-01 | Parcel U60 | Accessory building | |
2023-11-29 | Parcel GG | Accessory building | |
2023-11-17 | Block 13 Lot 1A | 101 Patricia Street | Interior renovation and secondary suite |
2023-11-28 | Block 13 Lot 2A | 103 Patricia Street | Interior renovation and secondary suite |
2023-11-28 | Block 9 Lot 14 & 15 | 640 Connaught Drive | Interior renovation |
2023-11-28 | Block 12 Lot 21 | 714A Patricia Street | Interior renovation |
2023-11-27 | Block 22 Lot 9 | 626A Connaught Drive | Interior renovation |
2023-11-15 | Block 5 Lot 10 | 410 Connaught Drive | Interior renovation |
2023-11-14 | Parcel GL | No 1 Old Lodge Road | Interior renovation and exterior renovation and landscaping |
2023-11-10 | Block 9 Lot 22 | 626 Connaught Drive | Interior renovation |
2023-11-10 | Block B Lot 3 | 404 Patricia Street | Sign |
2023-11-10 | Parcel AX and AY | 86 Connaught Drive | Sign |
2023-11-09 | Hazel Avenue from Stan Wright Drive to Compound Road | Utility services | |
2023-11-09 | Block 16 Lot 25 | 232 Colin Crescent | Landscaping |
2023-11-08 | Parcel AR and AS | Pyramid Lake Road | Utility services |
2023-11-07 | Block 16 Lot 11 | 219 Bonhomme Street | Interior renovation |
2023-11-02 | Parcel GJ | #3 Compound Road | Landscaping |
2023-11-02 | Block 17 Lot 4 | 209 Colin Crescent | Secondary Suite |
2023-11-02 | Parcel U | Pyramid Lake Resort | Exterior renovation |
2023-10-26 | Block 40 Lot 7 | 1218A Cabin Creek Drive | Exterior renovation |
2023-10-23 | Maligne Horse Range at Maligne Lake Road | Landscaping | |
2023-10-19 | Miette Hot Springs | Exterior renovation | |
2023-10-19 | Block 28 Lot 6 | 811 Turret Street | Exterior renovation |
2023-10-18 | Parcel BN | #10 Cottonwood Creek Road | Exterior renovation |
2023-10-16 | Block 2 Lot 2 | 47 Lake Edith | Landscaping |
2023-10-16 | Parcel CV-2 | 7-1001 Patricia Street | Exterior renovation |
2023-10-12 | Wabasso Campground to Geraldine Lake | Utility services | |
2023-10-12 | Parcel GL | 1 Old Lodge Road | Event tent |
2023-10-10 | Parcel CN, CO, CP | 2-230 Bonhomme Street | Interior renovation and exterior renovation |
2023-10-04 | Parcel CW | 303 Bonhomme Street | Accessory building |
2023-10-04 | Lake Annette | Event tent | |
2023-10-03 | Block 41 Lot 14 | 1118 Patricia Street | Deck |
2023-09-28 | Parcel CN, CO, CP | 36-230 Bonhomme Street | Interior renovation |
2023-09-26 | Block 20 Lot 2 | 14 Lake Edith | Utility services |
2023-09-27 | Parcel CV-2 | #11 1001 Patricia Street | Landscaping |
2023-09-27 | Block 28 Lot 34 | 812 Geikie Street | Interior renovation and exterior renovation |
2023-09-26 | Block 22 Lot 4 | 19 Lake Edith | Utility services |
2023-09-20 | Parcel CN,CO, CP | 5-230, Bonhomme Street | Interior renovation |
2023-09-14 | Parcel FL | Icefield Centre | Exterior renovation and landscaping |
2023-09-14 | Block 10 Lot 20 | 600 Patricia Street | Sign |
2023-09-13 | Block 17 Lot 7 | 308 Balsam Avenue | Exterior renovation and landscaping |
2023-09-13 | Block 13 Lot 23 | 104A Connaught Drive | Interior renovation |
2023-09-08 | Block 7 Lots 2 3 and 4 | 601 Patricia Street | Exterior renovation |
2023-09-07 | Parcel HB | Tekarra Resort | Accessory building |
2023-09-07 | Block R5 | 520 Turret Street | Exterior renovation |
2023-09-06 | Block 12 Lot 5 | 709 Geikie Street | Landscaping |
2023-08-29 | Parcel CW | 305 Bonhomme Street | Exterior renovation |
2023-08-25 | Block 40 Lot 30 | 1114 Cabin Creek Drive | Exterior renovation |
2023-08-25 | Block A Lots 4B & 5 | 500 Bonhomme Street | Deck and stair replacements |
2023-08-24 | Parcel GJ | 1 Compound Road | Exterior renovation |
2023-08-24 | Block 42 Lot 56 | 205 Ash Avenue | Landscaping |
2023-08-24 | Parcel GJ | 1 Compound Road | Landscaping |
2023-08-23 | Block 41 Lot 11 | 1212 Patricia Street | Interior renovation, exterior renovation and secondary suite |
2023-08-18 | Parcel GS | 1 Marmot Basin Road | Septic |
2023-08-15 | Block 45 Lot 71 | 1029 Lodgepole Street | Exterior renovation |
2023-08-15 | Block 27 Lot 21 | 810 Patricia Street | Secondary suite |
2023-08-03 | Parcel FX Lot 10 | 307 Willow Avenue | Interior renovation |
2023-08-03 | Block 23 Lot 13 | 818 Tonquin Street | Interior renovation |
2023-08-03 | Block 41 Lot 10 | 1214 Patricia Street | Exterior renovation |
2023-08-03 | Block 40 Lot 16 | 1200 Cabin Creek Drive | Exterior renovation |
2023-08-02 | Block 40 Lot 69 | 1118 Cabin Creek Drive | Interior renovation |
2023-07-27 | Block 14 Lot 26 | 103 Geikie Street | Exterior renovation |
2023-07-27 | Block 14 Lot 25 | 101 Geikie Street | Exterior renovation |
2023-07-27 | Wapiti Campground | Event Tent | |
2023-07-27 | Block 7 Lots 2 3 and 4 | 601 Patricia Street | Sign |
2023-07-21 | Block 23 Lot 16 | 812 Tonquin Street | Interior renovation, exterior renovation, and deck |
2023-07-20 | Block 25 Lots 6, 7, 18 | 733 Geikie Street | Exterior renovation |
2023-07-19 | Block 39 Lot 26, 27 | 1231 Cabin Creek Drive | Interior renovation |
2023-07-12 | Block 22 Lot 3 | 705 Miette Avenue | Demolition, secondary suite and garage suite |
2023-07-12 | Block 12 Lot 5 | 709 Geikie Street | Secondary suite |
2023-07-11 | Block 25 Lot 14 | 728 Patricia Street | Secondary suite |
2023-07-10 | Block 17 Lot 7 | 308 Balsam Avenue | Interior renovation |
2023-07-10 | Block 44 Lot 50 | 1005 Poplar Avenue | Interior renovation |
2023-07-10 | Block 24 Lot 25 | 716 Connaught Drive | Exterior renovation |
2023-07-06 | Parcel CW | 303 Bonhomme Street | Sign |
2023-07-05 | Block 30 Lot 1-5, 17-21 | 900 Connaught Drive | Exterior renovation |
2023-07-05 | Parcel U | Pyramid Lake Road | Sign |
2023-06-28 | Block 12 Lot 5 | 709 Geikie Street | Landscaping |
2023-06-28 | Block 23 Lot 7 | 813 Miette Avenue | Interior renovation |
2023-06-28 | Block 18 Lot 14 | 300 Pyramid Lake Road | Interior renovation |
2023-06-26 | Block 20 Lot 3 | 15 Lake Edith | Septic tank and utility service |
2023-06-23 | Willow Creek Warden Station | Weather station | |
2023-06-23 | Parcel CU-1 | 1006 Patricia Street | Apartment |
2023-06-21 | Block 32 Lots 1, 2, 3, 4, 5, 6, and 7 | 901 - 913 Turret Street | Demolition and apartment building |
2023-06-21 | Block 22 Lot 4 | 707 Miette Avenue | Landscaping |
2023-06-19 | Snaring Road | Bridge rehabilitation | |
2023-06-16 | Block 36 Lot 7 | 509 Turret Street | Event tent |
2023-06-16 | Block 44 Lot 47 | 1011 Poplar Ave | Interior renovation |
2023-06-14 | Block 27 Lot 15 | 822 Patricia Street | Secondary Suite |
2023-06-12 | Block 41 Lot 13 | 1208 Patricia Street | Deck or Patio / Interior renovations |
2023-06-12 | Block R5 | 520 Turret Street | Event tent |
2023-06-09 | Block 10 Lot 16 | 608 Patricia Street | Sign |
2023-06-08 | Block 9 Lot 26 | 618 Connaught Drive | Sign |
2023-06-08 | Block 27 Lot 11 | 821 Geikie Street | Deck |
2023-06-02 | Block 28 Lot 26 | 828 Geikie Street | Landscaping and exterior renovation |
2023-06-01 | Block 12 Lot 3 | 6 Lake Edith | Garage |
2023-05-23 | Block 17 Lot 7 | 308 Balsam Avenue | Exterior renovation |
2023-05-19 | Block 41 Lot 7 | 1220 Patricia Street | Exterior renovation |
2023-05-18 | Block 13 Lot 18 | 112 Connaught Drive | Demolition and garage suite |
2023-05-18 | Block 22 Lot 5 | 709 Miette Avenue | Interior renovation |
2023-05-17 | Parcel GV | Commemoration Park | Landscaping |
2023-05-17 | Parcel GR | Centennial Park | Landscaping |
2023-05-17 | Parcel CG | 76 Connaught Drive | Exterior renovation |
2023-05-15 | Miette Hot Springs | Interior renovation | |
2023-05-12 | Block 37 Lot 1 | 920B Bonhomme Street | Exterior renovation |
2023-05-11 | Block 12 Lot 24 | 721 Geikie Street | Interior renovation |
2023-05-11 | Block 15 Lot 2-2 Lot 3 | 107 Bonhomme Street | Two-unit dwelling and two secondary suites and demolition |
2023-05-10 | Parcel BN | Cottonwood Corrals | Accessory building |
2023-05-09 | Block 10 Lot 20 | 600 Patricia Street | Exterior renovation |
2023-05-03 | Block 9 Lot 22 | 626 Connaught Drive | Sign |
2023-05-01 | Block 5, Athabaska Park | 500 Connaught Drive | Interior renovation |
2023-05-01 | Parcel GJ | 1 Compound Road | Interior renovation |
2023-04-25 | Block 23 Lot 13 | 818 Tonquin Street | Landscaping |
2023-04-25 | Block 23 Lot 14 | 816 Tonquin Street | Landscaping |
2023-04-24 | Parcel FJ | Highway 93 | Building addition |
2023-04-18 | Block 16 Lot 34 | 214 Colin Crescent | Interior renovation |
2023-04-17 | Block 7 Lot 11 | 604 Connaught Drive | Interior renovation / exterior renovation |
2023-04-17 | Parcel FW, Lot 18 | 1054 Bonhomme Street | Deck |
2023-04-14 | Block 40 Lot 12 | 1208 Cabin Creek Drive | Exterior renovation |
2023-04-06 | Parcel GS | 1 Marmot Basin Road | Knob chairlift replacement |
2023-04-05 | Block 35 Lot 15 | 204 Bonhomme Street | Interior renovation |
2023-03-31 | Block 29 Lot 18 | 802 Turret Street | Exterior renovation |
2023-03-24 | Block 28 Lot 21 | 838 Geikie Street | Exterior renovation |
2023-03-23 | Block 6 Lots 10, 11 | 414 Patricia Street | Accessory building |
2023-03-23 | Block 9 Lot 26 | 618 Connaught Drive | Exterior renovation |
2023-03-16 | Block 14 Lot 21 | 106 Patricia Street | Building addition, Interior renovation |
2023-03-13 | Parcel U60 | Highway 16 West | Communications building |
2023-03-10 | Parcel J | 102 Bonhomme Street | Commercial accommodation |
2023-03-09 | Parcel AR & AS | Pyramid Lake Road | Sign |
2023-03-08 | Block 3 Lot 3 | 305 Patricia Street | Interior renovation |
2023-03-06 | Block 20 Lot 10 | 719 Maligne Avenue | Garage Suite |
2023-03-06 | Parcel CW | 303 Bonhomme Street | Exterior renovation |
2023-02-24 | Parcel FR | 607 Connaught Drive | Interior renovation |
2023-02-22 | Block 10 Lot 15 | 610 Patricia Street | Interior renovation |
2023-02-16 | Parcel GR | Centennial Park | Temporary Event tent |
2023-02-08 | Parcel GL | 1 Old Lodge Road | Landscaping |
2023-02-08 | Block 13 Lot 18 | 112 Connaught Drive | Interior renovation |
2023-02-06 | Block 40 Lot 79 | 7 Swift Crescent | Exterior renovation |
2023-01-27 | Parcel GJ | Landscaping | |
2023-01-26 | Block 40 Lot 85 | 1 Swift Crescent | Interior Renovation |
2023-01-12 | Block 42 Lot 28 | 1027 Poplar Avenue | One-unit dwelling, secondary suite |
2023-01-12 | Town of Jasper | Streets, Sidewalks, Open Spaces | Utility services |
2022-12-30 | Block 39 Lot 48 | #25 1199 Cabin Creek Drive | Interior renovation |
2022-12-30 | Block 41 Lot 8 | 1218 Patricia Street | Interior renovation |
2022-12-30 | Block 31 Lots 1-4 | 901 Geikie Street | Utility services |
2022-12-29 | Block 35 Lot 15 | 204 Bonhomme Street | Interior renovation |
2022-12-28 | Parcel AR & AS | Pyramid Lake Road | Exterior renovation |
2022-12-23 | Parcel U | Pyramid Lake Road | Commercial accommodation |
2022-12-20 | Parcel U | Pyramid Lake Road | Building addition |
2022-12-15 | Parcel GF | 821 Connaught Drive | Apartment |
2022-12-15 | Parcel GE | 801 Connaught Drive | Apartment |
2022-12-12 | Parcel GS | 1 Marmot Road | Landscaping |
2022-11-29 | Block 9 Lot 4 | 28 Lake Edith | One-unit dwelling and exterior renovation |
2022-11-25 | Block 27 Lot 17 | 818 Patricia Street | Building addition |
2022-11-24 | Miette Mountain Resort to Fiddle River Lookout | Utility services | |
2022-11-16 | Block 43 Lot 4 | 1047 Bonhomme Street | Accessory building & fence |
2022-11-15 | Block 40 Lot 12 | 1208 Cabin Creek Drive | Accessory building |
2022-11-09 | Block 14 Lot 18 | 112 Patricia Street | Exterior renovation |
2022-11-07 | Parcel J | 102 Bonhomme Street | Demolition |
2022-11-03 | Block S Lot 23 | 57 Stan Wright Drive | Entry door |
2022-11-03 | Parcel U60 | Exterior renovation | |
2022-11-02 | Block 44 Lot 70 | 1026 Lodgepole Street | One-unit dwelling and Secondary suite |
2022-11-01 | Parcel FR | 607 Connaught Drive | Sign |
2022-10-26 | Block 28 Lot 34 | 812 Geikie Street | Exterior renovation |
2022-10-24 | Block 38 Lot 2 | 1123 Cabin Creek Drive | Interior renovations, exterior door, shed demolition, shed construction |
2022-10-21 | Block 44 Lot 72 | 1024 Lodgepole Street | One-unit dwelling and Secondary suite |
2022-10-19 | Miette Mountain Resort to Fiddle River Lookout | Utility services | |
2022-10-19 | Sixth Bridge Access Road to Maligne Canyon Teahouse | Utility services | |
2022-10-18 | Block 17 Lot 8 | 306 Balsam Avenue | Garage |
2022-10-12 | Parcel FL | Icefield Centre | Demolition |
2022-10-12 | Block 39 Lot 32 | 1219A Cabin Creek Drive | Interior renovation |
2022-10-12 | Block 29 Lot 19 | 800 Turret Street | Garage suite |
2022-10-11 | Parcel FT | 518 Geikie street | Exterior renovation |
2022-10-05 | Block S Lot 38 | 30 Stan Wight Drive | Interior renovation |
2022-09-26 | Block S Lot 38 | 30 Stan Wight Drive | Landscaping |
2022-09-12 | Block 26 Lot 23 | 802 Connaught Drive | Interior renovation |
2022-08-31 | Block 10 Lot 12 | 616 Patricia Street | Interior renovations |
2022-08-31 | Block 39 Lot 31 | 1223 Cabin Creek Drive | Secondary suite |
2022-08-23 | Parcel GV | 301 Pyramid Lake Road | Event Tent |
2022-08-23 | Block 28 Lot 35 | 810 Geikie Street | Exterior renovation |
2022-08-15 | Block 10 Lot 1 | 603A Geikie Street | Interior renovation |
2022-08-11 | Block 9 Lot 26 | 618 Connaught Drive | Interior renovation |
2022-08-11 | Block 12 Lot 3 | #6 Lake Edith | Exterior renovation |
2022-08-04 | Block 40 Lot 24 | 1136 Cabin Creek Drive | Secondary suite |
2022-08-03 | Block 8 Lot 1 | #37 Lake Edith Road | Septic tank |
2022-08-02 | Block 35 Lot 37 | 23 Aspen Crescent | Landscaping |
2022-08-02 | Block 45 Lot 87 | 1003 Lodgepole Street | Exterior renovation |
2022-07-28 | Parcel FR | 607 Connaught Drive | Landscaping |
2022-07-22 | Parcel GW | Interior Renovation | |
2022-07-22 | Marmot Meadows | Accessory building | |
2022-07-20 | Parcel HD | Utility Services | |
2022-07-18 | Block 40 Lot 56 | 1211 Patricia Street | Interior renovation |
2022-07-15 | Block 5 Lot 15 | 4 Pyramid Lake Road | Interior renovation |
2022-07-11 | Block 9 Lot 19 | 632 Connaught Drive | Exterior renovation |
2022-07-08 | Block S Lot 21 | 53 Stan Wright Drive | Interior renovation |
2022-07-04 | Block 13 Lot 18 | 112 Connaught Drive | Interior renovation |
2022-07-04 | Block 44 Lot 44 | 1015 Poplar Avenue | Exterior renovation |
2022-06-29 | Block 12 Lot 3 | #6 Lake Edith | Septic tank |
2022-06-24 | Block 5 Lot 7 | 416 Connaught Drive | Sign |
2022-06-23 | Block 9 Lot 22 | 626 Connaught Drive | Interior renovation |
2022-06-23 | Block 40 Lot 68 | 1120 Cabin Creek Drive | Interior renovation |
2022-06-23 | Block 40 Lot 82 | 4 Swift Crescent | Interior renovation |
2022-06-22 | Parcel CQ | Tekarra Lodge | Commercial accommodation |
2022-06-20 | Block 10 Lot 12 | 616 Patricia Street | Interior renovations |
2022-06-17 | PARCEL CA | 315 Connaught Drive | Landscaping |
2022-06-16 | Block 28 Lot 5 | 809 Turret Street | Landscaping |
2022-06-13 | Block 7 Lot 8 | 610 Connaught Drive | Interior renovation |
2022-06-10 | Parcel FT | 518 Geikie Street | Interior renovation |
2022-06-10 | Parcel FT | 518 Geikie Street | Landscaping |
2022-06-09 | Block 35 Lot 15 | 204 Bonhomme Street | Secondary suite |
2022-06-08 | Block 40 Lot 24 | 1136 Cabin Creek Drive | Interior renovations |
2022-05-20 | Parcel J | 102 Bonhomme Street | Commercial accommodation |
2022-05-31 | Parcel AY | 86 Connaught Drive | Signs |
2022-05-27 | NOS District | Public Open Space District | Utility services |
2022-05-26 | Palisades Centre | Snaring Road | Interior renovation |
2022-05-20 | Cottonwood Corrals Association | Accessory building | |
2022-05-19 | Block 39 Lot 48 | 1199 Cabin Creek Drive Unit 45 | Interior renovation |
2022-05-18 | Parcel CU-1 | 1008 Patricia Street | Apartment |
2022-05-17 | Block 41, Lot 25 | #5 Brewster Crescent | Interior renovation |
2022-05-11 | QS-SE SEC-27 TWP-046 RGE-01 MER-6 | Athabasca Day Use | Event tent |
2022-05-03 | Open Space | 300 Connaught Drive | Landscaping |
2022-05-05 | Block 24 Lot 17 | 732 Connaught Drive | Exterior renovation |
2022-05-05 | Block 22 Lot 10 | 719 Miette Ave | Deck and entry door |
2022-05-06 | Block 39 Lot 11 | 1199 Cabin Creek Drive Unit 53 | Interior renovation |
2022-05-06 | Block 17 Lots 14 and 15 | 206 Geikie Street | Interior renovation |
2022-05-09 | Block 39 Lot 26 | 1231 Cabin Creek Drive | Interior renovation |
2022-04-25 | Block 20 Lot 14 | 714 Miette Avenue | Garage shingle replacement |
2022-04-26 | Block 42 Lot 30 | 1025 Poplar Avenue | Interior renovations (Basement) |
2022-04-27 | Unsurveyed | Compound Road | Road widening |
2022-05-02 | Block 34 Lot 10 | 919 Bonhomme Street | Interior renovation |
2022-04-20 | Block R9 Lot 1 | 720 Geikie Street | As-Built interior renovation |
2022-04-25 | Parcel GJ | Compound Road | Communication line |
2022-04-06 | Parcel GR | Centennial Park | Temporary event tent |
2022-04-07 | Parcel GK | #2 Cottonwood Creek Road | Demolition 7 Cabins and Development 2 Two-unit Cabins |
2022-04-07 | Block S | Stan Wright Industrial | Recycle Centre and Bulk Water and Sanitary Station |
2022-04-07 | Block 23 Lot 16 | 812 Tonquin | Windows and Siding |
2022-04-08 | Block 42 Lot 54 | 209 Ash Ave | Fence |
2022-04-08 | Block 39 Lot 38 | 56 SM V | Basement Development |
2022-04-11 | Block 42 Lot 54 | 209 Ash Ave | Patio Door |
2022-04-08 | Block 16 Lot 36 | 210 Colin Crescent | Shingle Replacement |
2022-04-08 | Block 39 Lot 48 | 1199 Cabin Creek Unit 32 | Interior Renovations |
2022-04-11 | Block 10 Lot 11 | 618A Patricia Street | As-built Mechanical upgrades |
2022-03-31 | Block 12 Lot 24 | 721 A Geikie Street | Interior renovation (Kitchen) |
2022-04-04 | Block 41 Lot 7 | 1220 Patricia Street | Deck |
2022-04-04 | Block 5 Lot 15 | 400 Connaught Drive | Sign |
2022-03-14 | Block 22 Lot 5 | 709 Miette Ave | Exterior cladding replacement |
2022-03-14 | Parcel CG | 76 Connaught Drive | Sign |
2022-03-16 | Parcel GL | 1 Old Lodge Road | Landscapping (phase 2022) |
2022-03-15 | Parcel FJ | Accessory building | |
2022-03-18 | Block 13 Lot 17 | 114 Connaught Drive | Interior renovation (Kitchen) |
2022-03-22 | Parcel FR | 607 Connaught Dr | Sign |
2022-03-04 | Recreational Open Space Parcel | Connaught Drive | Landscaping (Bike Park) |
2022-03-09 | Block GS | 1 Marmot Basin Road | Portable washrooms |
2022-03-10 | Block 36 Lots 4-17, 20-24 | 514 Robson Street | Exterior cladding replacement |
2022-03-10 | Block 22 Lot 5 | 709 Miette Ave | Exterior cladding replacement |
2022-02-23 | Block 39 Lot 8 | 1205 Cabin Creek Drive | Second storey deck renovation |
2022-02-24 | Parcel GL | #1 Old Lodge Road | Infrastructure |
2022-02-25 | Block 14 Lot 28 | 100 Patricia Street | Two-unit dwelling and two secondary suites |
2022-03-02 | Parcel GL | #1 Old Lodge Road | Landscaping (2022 Phase) |
2022-02-15 | Block 39 Lot 9 | 1203 Cabin Creek Drive | Fence |
2022-02-21 | Blocl 31 Lot 22 | 201 Pine Ave | Interior Renovation - basement bedroom |
2022-02-21 | Block 28 Lot 5 | 809 Turret Street | Basement development as built |
2022-02-04 | Block 10 Lot 20 | 600 Patricia Street | New sign(s) |
2022-02-08 | Block 2 Lot 23 | 200 Patricia Street | Basement Interior Renovation |
2022-02-09 | Block AW | 98 Geikie Street | Shingle Replacement |
2022-02-01 | 1/4 Section NE Sec 9 Twp 45 R1 W6M, junction of Hwy 93a and Hwy 16 | Staff work camp | Storage shed installation |
2022-01-31 | Block 10 Lot 11 | 618 Patricia Street | Basement redevelopment |
2022-02-01 | Astoria to Wabasso | Communications line | |
2022-01-25 | Block 39 Lot 48 | 1199 Cabin Creek Drive | Building tampering and hazards |
2022-01-27 | Block 42 Lot 24 | 1035 Poplar Ave | One-unit dwelling and secondary suite |
2022-01-18 | Block 35 Lot 15 | 204 Bonhomme Street | As-Built Secondary Suite |
2021-12-31 | Columbia Icefield Section 33, TP37, R23, W5M Highway 93 | Icefields Centre | Power Cable Tray Installation |
2022-01-05 | Block 42 Lot 25 | 1033 Poplar Ave | Interior renovation |
2022-01-05 | Block 9 Lot 22 | 626 Connaught Drive | One Projecting Sign |
2021-12-20 | Block 26 Lot 22 | 804 Connaught Drive | Secondary Suite |
2021-12-21 | Block A | Lot 4B and 5 | Deck and Stair Replacement (Unit 37) |
2021-12-23 | Block 40 Lot 7 | 1218B Cabin Creek Drive | Walkway and stairs |
2021-12-29 | Parcel FJ | Icefields Staff Camp | Temporary Staff Trailers |
2021-12-14 | Block 40 Lot 21 | 8 Brewster Crescent | Accessory Building |
2021-12-20 | Parcel M | Alpine Village | Staff Accommodation |
2021-12-13 | Block 10 Lots N 1/2 13, 14, 15 | 610 Patricia Street | Interior Renovations |
2021-11-10 | Block 39 Lots 28 & 29 | 1227B Cabin Creek Drive | Deck repair |
2021-11-10 | Parcel A | Pocahontas Bungalows | Entry and building signs |
2021-11-16 | Block 9 Lot 8 | 625 Patricia Street | New bathroom and emergency exit |
2021-11-18 | Hwy 93A Astoria Hydro to Wabasso Campground | Overhead powerline replacement | |
2021-11-22 | Water Reservoir Road | Overhead powerline burial | |
2021-11-22 | Block 39 Lots 28 & 29 | 1227 Cabin Creek Drive | Deck repair |
2021-10-26 | CU-1 | 1001-1035 Patricia Street | Parking lot site preparation |
2021-10-29 | Parcel FL | Icefield Centre | Road and water storage reservoir |
2021-11-01 | Block 8 Lot 2 | 36 Lake Edith | Demolition and redevelopment of cottage, accessory building and septic tank |
2021-11-03 | Block 39 Lot 48 | Unit 66 1199 Cabin Creek Drive | Solar tube |
2021-09-29 | Block 22 Lot 5 | 709 Miette Avenue | Interior Renovation |
2021-09-27 | Block 9 Lot 8 | 625 Patricia Street | Roof Repair |
2021-09-29 | Block AX and AY | Fascia Color Change | |
2021-09-29 | Block AX and AY | 86 Connaught Drive | Signs x 2 with Gooseneck Lighting |
2021-10-01 | Block 40 Lot 48 | 1121 Patricia Street | Interior Renovation |
2021-09-14 | Block 28 Lot 12 | 823 Turret Street | Exterior cladding |
2021-09-15 | Block 34 Lot 13 | 914 Tonquin Street | Accessory building removal and redevelopment (Greenhouse) |
2021-08-27 | Parcel AX AY | 86 Connaught Drive | Starbucks (Interior Renovation) |
2021-08-26 | Parcel CV-1 | #2 Patricia Place | Patio |
2021-09-01 | Block 40 Lot 38 | 1101 Patricia Street | Accessory Building Modification |
2021-08-16 | Block 41 Lot 17 | 1112 Patricia Street | Shed dormers and shingle replacement |
2021-08-13 | Block 20 Lot 12 | 718 Miette Avenue | Shingle replacement (Garage) |
2021-08-17 | Block 41 Lot 17 | 1112 Patricia Street | As-Built bathroom reno |
2021-08-19 | Block 9 Lot 22 | 626 Connaught Drive | Interior renovations (Cannabis Retail) |
2021-08-18 | Parcel FX Lot 11 | 305 Willow Avenue | Patio |
2021-08-19 | Block 27 Lot 4 | 807 Geikie Street | Shingle replacement |
2021-08-23 | Block 40 Lot 36 | 1102 Cabin Creek Drive | As-Built deck |
2021-08-09 | Parcel CA | 315 Connaught Drive | Building Demolition |
2021-08-10 | Block 5 Lot 2 | 407 Patricia Street | Temporary Patio Tents |
2021-07-27 | Parcel GL | 1 Old Lodge Road | Temporary event tent |
2021-07-30 | Block 22 Lot 3 | 705 Miette Ave | Roof replacement |
2021-07-21 | Parcel FW | 1070 Bonhomme Street | Deck |
2021-07-14 | Block 12, Lot 3 | 6 Lake Edith | Windows, siding, insulation |
2021-07-13 | Block 22, Lot 5 | 709 Miette Avenue | New roof and roof insulation |
2021-07-13 | Block 44, Lot 82 | 1010 Lodgepole Street | Interior reno (kitchen) and window additions |
2021-07-15 | Block 14, Lot 16 | 116 Patricia Street | New garage |
2021-07-02 | Block 22, Lot 3 | 705 Miette Avenue | Shed removal |
2021-07-05 | Block 10, Lot 20 | 600 Patricia Street | Interior renovation (Cannabis Retail) |
2021-07-07 | Block 40, Lot 67 | 1122 Cabin Creek Drive | Secondary suite |
2021-07-07 | Parcel GR | Centennial Park | Temporary tent |
2021-07-08 | Parcels GA, GB, GC | 303 Pyramid Lake Road | Municipal Utility Stub-ins and development space for the installaion of water main and sanitary sewer lines installed on municipal lands |
2021-06-24 | Block 2 Lot 18 | 204 Patricia Street | Side fence and landscaping |
2021-07-02 | Block 2 Lot 18 | 204 Patricia Street | Patio/stair repairs and landscaping |
2021-06-22 | Block 41 Lot 21 | 8 Brewster Crescent | Shingle replacement |
2021-06-25 | Shangri-la ski cabin | Utility upgrades | |
2021-06-25 | Block 39 Lot 17 | 1251 Cabin Creek Drive | Exterior renovations |
2021-06-28 | Block 16 Lot 36 | 210 Colin Crescent | Fence |
2021-06-28 | Parcel AX & AY | Change of Use from Commerical Accommodaton to Staff Accommodation | |
2021-06-29 | Block 2 Lot 5 | 50 Lake Edith | Septic Tank |
2021-06-29 | Block 2 Lot 4 | 7 Orion Close | Septic tank replacement |
2021-07-02 | Parcel U | Wastewater treatment plant and disposal system | |
2021-06-17 | Parcelle U213 | Maligne Lake | Canoe storage rack |
2021-06-17 | Block 7 Lot 10 | 606 Connaught Drive | Roof repair |
2021-06-17 | Block 35 Lot 30 | 9 Aspen Crescent | Change in siding material/colour and rear fence replacement |
2021-06-18 | Block 23 Lot 1 | #20 Lake Edith Subdivision | Deck |
2021-06-21 | Parcel CN, CO, CP | 230 Bonhomme St | Landscaping and patio |
2021-06-23 | Block 1 Lot 5 | 209 Patricia Street | Reconstruct front deck |
2021-06-15 | Block 5 Lots 12 & 13 | 404 & 406 Connaught Drive | Sidewalk patio tents |
2021-06-10 | Block 8 Lots 14 and 15 | 500 Patricia Place | Sidewalk and stairs |
2021-06-10 | Parcel FW | 1084 Bonhomme Street | Rear patio |
2021-06-14 | Parcel CV-1 | #4 Patricia Place Condos | Rear fence |
2021-06-14 | Block 12 Lot 24 | 721 A Geikie Street | Basement renovations |
2021-06-02 | Athabasca Park | Indigenous Exhibit | |
2021-06-02 | Block 42 Lot 36 | 1019 Poplar Ave | Exterior colour change |
2021-06-03 | Block 26 Lot 22 | 804 Connaught Drive | Shingle replacement |
2021-06-03 | Block 14 Lot 21 | 106 Patricia Street | Interior renovations (bedroom additions) |
2021-06-04 | Streets, Sidewalks, Open Spaces | Annual utilities installation | |
2021-06-07 | Parcel AG | Maligne Wilderness Kitchen | Temporary ancilliary building |
2021-06-07 | Block CN, CO, CP | #39 230 Bonhomme Street | Interior renovation, fence and patio |
2021-06-07 | Parcel CV-1 | #10 Patricia Place | Rear fence |
2021-05-25 | Paddock 4 | New shelter | |
2021-05-25 | Block 34 Lot 5 | 909 Bonhomme Street | Secondary Suite |
2021-05-26 | Block 34 Lot 5 | 909 Bonhomme Street | Window addition and as-built washer/dryer |
2021-05-27 | Block 25 Lots 6, 7, 18 | 733 Geikie Street | Change in exterior siding and material |
2021-05-14 | Block 9 Lot 25 | 620B Connaught Drive | Tents |
2021-05-14 | Block 7 Lot 5 | 607 Patricia Street | Tent |
2021-05-17 | Block 23 Lot 4 | 807 Miette Ave | Secondary Suite |
2021-05-19 | Parcel GL | 1 Old Lodge Road | Critical Infrastructure Upgrades |
2021-05-06 | Block 40 Lot 40 | 1105 Patricia Street | Secondary suite |
2021-05-07 | Open Space Corridor East side of Connaught Drive between 200 block and Parcel GD | ATCO Electric Underground Utility | |
2021-05-07 | Block A Lots 4B & 5 | 500 Bonhomme Street | Deck & stair replacements |
2021-05-07 | Parcel GK | New Road Sign on LOO | |
2021-05-07 | Block 12 Lot 2 | 5 Lake Edith | Shed |
2021-05-10 | Block 39 Lot 48 | #56 Stone Mountain | Interior bathroom addition |
2021-05-03 | Block 44 Lot 66 | 1030 Lodgepole Street | Residential Dwelling |
2021-05-05 | Block 39 Lot 48 | #11 Stone Mountain Village | Hot Tub As Built |
2021-05-05 | Parcel CV-1 | Paticia Place Condos | Fence |
2021-05-05 | Parcel CV-1 Lot 66 | 33 Patricia Place | Secondary Suite |
2021-05-05 | Unsurveyed public parking lot located east of the 200 block of Connaught Drive. | Electric Vehicle Charging Stations | |
2021-04-22 | Block 10 Lot 20 | 600 Patricia Street | Interior renovation (Retail) |
2021-04-22 | Parcel U83 | Section 33, TP37, R23, W5M Highway 93 | Tent |
2021-04-23 | Block 41 Lot 27 | 3 Brewser Crescent | Basement renovation |
2021-04-26 | Block 18 Lots 4 & 5 | 305 Balsam Avenue | Fence (Front Yard) |
2021-04-27 | Blocl 43 Lot 45 | 1010 Poplar | Secondary Suite |
2021-04-28 | Paddock #5 | Change hay shed roof - Leaking | |
2021-04-15 | Block 39, Lot 17 | 1251 Cabin Creek Drive | Interior Renovations |
2021-04-17 | Block 9, Lot 25 | 620 Connaught Drive | Tent |
2021-04-19 | Block 20, Lot 14 | 714 Miette Avenue | Fence |
2021-04-20 | Block CG | 76 Connaught Drive | Elevated Walkway |
2021-04-06 | Parcel CL | 701 Connaught Drive | Roof and Fascia Replacement |
2021-04-06 | Quart NE Sec. 9 Tp 45 R1 W6M | Old Woodlot - Hwy 93a | Seasonal (Temporary) Staff Accommodation Facilities |
2021-04-07 | Block 30, Lot 1-5, 17-21 | 902 Connaught | Interior Renovation |
2021-04-07 | Block FY, Lot 2 | 1038 Patricia Street | Fence and Patio |
2021-04-08 | Block 42, Lot 55 | 207 Ash Avenue | One-Unit Dwelling Redevelopment w/ Accessory Dwelling Unit |
2021-04-14 | Parcel HB | Tekarra Resort | Landscaping |
2021-04-15 | Parcel GJ | 1 Compound Road | Heliport |
2021-04-15 | Block 5, Lot 15 | #1 400 Connaught Drive | Interior Renovation (Eating Establishment) |
2021-03-26 | Parcel J | 102 Bonhomme Street | Redevelopment Units 19 and 20 |
2021-03-28 | Block 15, Lot 15 | 227 Bonhomme Street | Develop one additional parking stall and relocate fence |
2021-03-29 | Block 39, Lot 29 | 1227A Cabin Creek Drive | Deck Repair |
2021-03-30 | Block 42, Lot 54 | 209 Ash Avenue | Roof Replacement |
2021-03-30 | Block 9, Lot 20 | 630 Connaught Drive | As-Built Fence Relocation and Demolition |
2021-03-30 | Block 40, Lot 9 | 1216 Patricia Street | Compliance Inspection Deficiencies |
2021-03-24 | Block 35, Lot 25 | 2 Aspen Crescent | Interior Renovations |
2021-03-25 | Block 14, Lot 8 | 115 Geikie Street | Fence |
2021-03-17 | Block 42, Lot 30 | 1025 Poplar Ave | One-Unit Dwelling Redevelopment |
2021-03-11 | Block 5, Lots 1 and 16 | 401 Patricia Street | Deck Extension (Eating Establishment) |
2021-03-11 | Block 39, Lot 33 | 1219 Cabin Creek Drive | As-Built Secondary Suite (Transition Compliance) |
2021-02-25 | Block 9, Lot 20 | 630 Connaught Drive | As-Built Detached Accessory Building (Shed) |
2021-02-21 | Block A, Lot 9 | Unit 13, 700 Bonhomme Street | Basement Bathroom Deficiencies |
2021-02-22 | Block 9, Lot 20 | 630 Connaught Drive | As-Built Interior Renovations & Attached Storage Shed Addition |
2021-02-23 | Block 1, Lot 12-20 | 200 Connaught Drive | One new business sign |
2021-02-11 | Miette Hot Springs Road | Electric Distribution Line | |
2021-02-12 | Parcel CU-1 | 1010 Patricia Street | Apartment Building |
2021-02-16 | Block A, Lot 9 | Unit 13, 700 Bonhomme Street | Resolve Garage Bathroom Deficiency |
2021-02-15 | Parcel GK | 2 Cottonwood Creek Rd | Interior Renovation (Kitchen) - Pine Bungalows |
2021-01-29 | Block 43, Lot 8 | 1039 Bonhomme Street | One-Unit Dwelling Redevelopment |
2021-02-02 | Block 9, Lots 6 & 7 | 621 Patricia Street | Two new signs - fascia and hanging |
2021-02-04 | Block 10, Lots 21 & 22 | 203 Miette Avenue | HVAC Demolition & Replacement |
2021-01-25 | Block 10, Lot 20 | 600 Patricia Street | Compliance Deficiencies |
2021-01-25 | Block 10, Lot 20 | 600 Patricia Street | Keg Room Development |
2021-01-18 | Block 10, Lot N 1/2 13, 14, 15 | 610-612 Patricia Street | Escalator Demolition and Second Floor Interior Renovation |
2021-01-11 | Parcel GL | 1 Old Lodge Road | 2021 Site Circulation and Landscape Rehabilitation |
2021-01-11 | Block 36, Lot 15-17 | 529 Turret Street | Mechanical Upgrades and Exhaust Stack Demolition |
2021-01-13 | Miette Hot Springs Pools | Building Foundation Maintenance | |
2020-12-22 | Block 16, Lot 14 | 225 Bonhomme Street | Interior Renovation (Bathroom Addition) |
2020-12-24 | Block 40, Lot 85 | 1 Swift Crescent | Hot Tub Installation |
2020-12-24 | Parcel GL | 1 Old Lodge Road | Tent |
2021-01-04 | Block BQ | Jasper Park Riding Stables | Reconstruct Balconies on Main House |
2021-01-06 | Block 9, Lot 25 | 620 Connaught Drive | Interior Renovation (Eating Establishment - Fiddle River) |
2021-01-06 | Parcel FJ | Icefields Staff Camp | Generator |
2021-01-07 | Block 40, Lot 54 | 1207 Patricia Street | Secondary Suite Transition Compliance & Interior Renovation |
2020-12-18 | Block 40, Lot 1 | 1230 Cabin Creek Drive | Secondary Suite (As-Built Compliance) |
2020-12-18 | Parcel GS | 1 Marmot Basin Road | Temporary Tent (Marmot Basin Caribou Chalet) |
2020-12-22 | Block 16, Lot 14 | 225 Bonhomme Street | Interior Renovation (Bathroom Addition) |
2020-12-24 | Block 40, Lot 85 | 1 Swift Crescent | Hot Tub Installation |
2020-11-30 | Block 40, Lot 24 | 1136 Cabin Creek Drive | As-Built Secondary Suite (Compliance) |
2020-12-13 | Block 35, Lot 38 | 25 Aspen Crescent | Interior/exterior handrails and guards |
2020-12-15 | Block 10, Lot 18 | 606 Patricia Street | Interior Renovation (Trademark Hair Company Expansion) |
2020-12-16 | Block 9, Lot 1, 2, 3 | 611 Patricia Street | Interior Renovation (Tim Hortons) |
2020-12-17 | Parcel CD | 78 Connaught Drive | Hotel |
2020-11-20 | Parcel CN, CO, CP Aspen Gardens | 230 Bonhomme Street - Unit 21 | Basement Renovation |
2020-11-22 | Block CN, CO, CP | 33 Aspen Gardens - 230 Bonhomme Street | Basement Development - Music Room |
2020-11-22 | Block 10 Lot 8 | 617 Geikie Street | As-built Renovations - Storage conversion to bedroom and bathroom and lower storage area next to garage |
2020-11-26 | Block FW Lot 29 | 1032 Bonhomme Street | Home Based Business - Type 1 |
2020-11-09 | Block 43, Lot 4 | 1047 Bonhomme St | Interior Renovation & Wood Stove |
2020-11-16 | Parcel GS | #1 Marmot Basin Road | Temporary Tents and Trailers (Marmot Basin) |
2020-11-09 | Block 43, Lot 4 | 1047 Bonhomme | Interior Renovation & Wood Stove |
2020-11-06 | Block 42, Lot 27 | 1029 Poplar Ave | Secondary Suite |
2020-10-29 | Block 23, Lot 5 | 24 Lake Edith | As-Built Cottage Renovations |
2020-11-02 | Athabasca Falls Warden Station | Equipment Shelter Removal | |
2020-11-02 | Block 9, Lot 28 | 614-C Connaught Drive | Interior Renovation - Eating Establishment |
2020-11-04 | Block 9, Lot 6 & 7 | 621 Patricia Street | Interior Renovation - Eating Establishment |
2020-10-28 | Block 23, Lot 16 | 812 Tonquin Street | Hot tub and patio |
2020-10-16 | Block 17, Lot 1 | 200 Geikie Street | Rear Fence Removal |
2020-10-16 | Block 36, Lots 4-17 and 20-24 | 518 Robson Street | COVID 19 Testing Trailer |
2020-10-19 | Block 39, Lot 48 | 64 Stone Mountain Village | Sono Light installation |
2020-10-19 | Parcel U | Pyramid Lake Resort | Septic Tank Replacement |
2020-10-22 | Block 8, Lots 14-15 | 500 Patricia Street | Interior Renovation |
2020-10-09 | Block 35 Lot 39 | 27 Aspen Crescent | Basement Interior Renovation |
2020-09-28 | Parcel AL & AZ | 96 Geikie Street | As-Built Parkade Wall Additions |
2020-09-30 | Parcel GK | 2 Cottonwood Creek Road | Interior Renovation Cabins 63-65 and 70-74 |
2020-10-02 | Block 44 Lot 82 | 1010 Lodgepole Street | Basement Interior Renovation |
2020-10-05 | Block 20 Lot 2 | 14 Lake Edith Subdivision | Sunroom Exterior Cladding and Window Replacement |
2020-10-06 | Parcel FL | Icefields Centre | Transfer Station Tank Replacement |
2020-10-06 | Block 36, Lots 4-17 and 20-24 | 509 Turret Street | Wheelchair Access Ramp and Stair Replacement |
2020-08-27 | Poboktan Creek Warden Station | Pedestal installation | |
2020-08-27 | Athabasca Falls Hostel | Duct and pedestal installation | |
2020-08-28 | Parcel J | 102 Bonhomme Street | Main Lodge renovation |
2020-08-28 | Block 45 Lot 89 | 1001 Lodgepole Street | Deck extension |
2020-08-31 | Block 40 Lot 48 | 1121 Patricia Street | Exterior cladding and roof |
2020-09-10 | Block 43 Lot 4 | 1047 Bonhomme Street | Exterior cladding and roof |
2020-09-15 | Block 14, Lot 13A | 122 Patricia Street | Shingle replacement |
2020-09-15 | Block 2 Lot 3 | 205 Geikie Street | Shingle replacement |
2020-09-15 | Parcels CN, CO, CP | Unit 36 - 230 Bonhomme Street | Basement renovation |
2020-09-15 | Parcel CL | 701 Connaught Drive | Roofing and fascia |
2020-09-15 | Parcel FW, Lot 3 | 1084 Bonhomme Street | Fence |
2020-09-15 | Block 21 Lot 12 | 814 Miette Avenue | Shingle replacement |
2020-09-15 | Block 34 Lot 2 | 903 Bonhomme Street | New bathroom |
2020-09-17 | Block 38 Lot 4 | 1119 Cabin Creek Drive | Shingle replacement |
2020-09-23 | Block 2, Lot 21 | 201 Geikie Street | Shingle replacement |
2020-09-28 | Block 14 Lot 27 | 102 Patricia Street | Two unit dwelling |
2020-08-19 | Block 23 Lot 4 | #24 Lake Edith | Septic tank |
2020-08-19 | Block 10 Lot 2 | #2 Lake Edith | Septic tank |
2020-08-20 | Poboktan Creek Warden Station | PED installation PEO removal | |
2020-08-21 | Block 14 Lot 21 | 106 Patricia Street | Overhead power line burial |
2020-08-21 | Block 43 Lot 6 | 1043 Bonhomme Street | Shingle replacement |
2020-07-29 | Block 13 Lot 19 | 110 Connaught Drive | Basement PHA building code issues |
2020-07-30 | Sunwapta Falls Resort | Septic tank installation | |
2020-08-07 | Block 1 Lot 10 | #1 Lake Edith | Roof replacement |
2020-08-05 | Block 22 Lot 4 | #19 Lake Edith | Septic tank installation |
2020-08-06 | Parcel FW | 1000 Bonhomme Street | Patio |
2020-08-06 | Block A Lots 4B & 5 | 500 Bonhoome Street | Community Garden |
2020-08-07 | Block 22 Lot 10 | 719 Miette Avenue | Basement window expansion |
2020-08-12 | Block 101 Lot 14 | 90 Patricia Circle | Skating rink pad and lighting demolition |
2020-08-13 | Block 31 Lot 16 | 912 Patricia Street | Fence |
2020-08-13 | U200 MOJ Land Use Agreement | 620B Connaught Drive | Temporary patio tents (Downstream Bar) |
2020-08-14 | Block 31 Lot 16 | 912 Patricia Street | Exterior cladding colour change |
2020-07-24 | Block 25 Lot 5 | 731 Geikie Street | Shingle Replacement |
2020-07-24 | Block 43 Lot 15C | 1006 Poplar Avenue | Patio |
2020-07-24 | Block 43 Lot 6 | 1043 Bonhomme Street | Fence |
2020-07-27 | Block 33, Lots 1-9 | 900 Turret Street | Playground installation |
2020-07-29 | Beauty Creek Hostel | Photovaltaic System | |
2020-07-16 | Block 40 Lot 13 | 1206 Patricia Street | Addition / Removal of skylights |
2020-07-17 | Parcel CV-1 | #24 Patricia Place | Patio |
2020-07-17 | Block 43 Lot 14 | 1027 Bonhomme Street | Shingle replacement |
2020-07-23 | Block A Lots 4B and 5 | 500 Bonhomme Street | Deck and stair replacements |
2020-07-23 | Block 13 Lot 19 | 110 Connaught Drive | Backyard landscaping and patio |
2020-06-26 | Block 31 Lot 16 | 912 Patricia Street | Shingle replacement |
2020-06-30 | Block 10 Lot 12 | 616 Patricia Street | Compliance issues |
2020-07-02 | Parcel GR | Ball Diamonds | Demolition of ball diamonds |
2020-07-03 | Block 26 Lot 7 | 813 Patricia Street | Stairs and landing replacement |
2020-07-06 | Parcel CN, CO, CP | 230 Bonhomme Street | Basement renovation |
2020-07-07 | Block 20 Lot 10 | 719 Miette Avenue | Fence |
2020-07-07 | Block 14 Lot 17 | 114 Patricia Street | Shingle replacement |
2020-07-10 | Block 41 Lot 20 | 1106 Patricia Street | Install exterior stair handrails and guards |
2020-07-10 | Block 40 Lot 25 | 1134 Cabin Creek Drive | Cladding replacement |
2020-07-10 | Block 10 Lot 14, 15 | 610 Patricia Street | Interior renovation |
2020-07-16 | Parcel FW | 1046 Bonhomme Street | Fence and patio |
2020-06-22 | Connaught Drive - East and West Entrance | Town entance signs replacement | |
2020-06-22 | Block 3 Lot 16 | 308 Connaught Drive | Three new signs |
2020-06-22 | Block A Lot 4B, 5 | 500 Bonhomme Street | Deck and Stair Replacement |
2020-06-23 | Block 10 Lot 1 | 603 Geikie Street | Four-Unit Dwelling |
2020-06-24 | Block 101 Lot 14 | 90 Patricia Circle | Demolition of Ice Rink |
2020-06-25 | Parcel FW Lot 14 | 1002 Bonhomme Street | Patio |
2020-06-26 | Parcel CW | 303 Pyramid Lake Road | Roof Replacement |
2020-06-26 | Parcel CV-1 | Patricia Place Condos | Fence Replacement |
2020-06-12 | Block 21 Lot 12 | 814 Miette Avenue | Cladding, Patio, Window and Door |
2020-06-16 | Parcel U-135 U-133 | Maligne Lake | Boat Dock Extension |
2020-06-17 | Block 10 Lot 12 | 616 Patricia Street | Rear Parkade Stairs and Additional Building Modifications |
2020-06-17 | Block 37 Lot 12-18 | #12 922 Bonhomme Street | Fence |
2020-06-10 | Parcel AX & AY | 86 Connaught Drive | Storage Areas Fireproofing |
2020-06-10 | Block 14 Lot 7 | 113 Geikie Street | Hot Tub |
2019-09-13 | SE SEC-16 TWP-045 RGE-01 MER-6 | Stan Wright Parking Lot | Streetlights |
2020-05-25 | Parcel GL | 1 Old Lodge Road | One new sign |
2020-05-27 | Block 20 Lot 11 | 720 Miette Avenue | Interior/exterior renovation |
2020-05-29 | Parcel CN, CO, CP | #19 230 Bonhomme Street | New window and exterior cladding |
2020-05-29 | Parcel FW | 1020 Bonhomme Street | Patio and fence |
2020-06-02 | Athabasca Park | Athabasca Park | Indigenous Exhibit |
2020-05-25 | Parcel GL | 1 Old Lodge Road | One new sign |
2020-05-27 | Block 20 Lot 11 | 720 Miette Avenue | Interior/Exterior Dwelling Renovation |
2020-05-13 | Block 12 Lot 24 | 721B Geikie Street | Basement Reno & Parking Stall |
2020-05-15 | Parcel FW Lot 10 | 1070 Bonhomme Street | Patio Addition |
2019-07-09 | Block 25 Lot 25 | 720 Patricia Street | Two-Unit Dwelling |
2020-05-11 | Block 9 Lot 1, 2, 3 | 611 Patricia Street | Dryer Vent |
2020-05-11 | Block 5 Lot 7 | 416 Connaught Drive | Bird Deterrent |
2020-05-12 | Parcel CN CO CP Unit 38 | #38 230 Bonhomme Street | Interior Renovation |
2020-05-12 | Block 13 Lot 6 | 111 Patricia Street | Roof Replacement |
2020-05-13 | Parcel CW | 303 Bonhomme Street | Arena/Curling Rink Slab Replacement |
2020-05-15 | Block 31 Lot 21 | 902 Patricia Street | Multi-Unit Dwelling |
2020-04-30 | Block 25, Lot 5 | 731 Geikie Street | One room of Private Home Accommodation |
2020-05-04 | Parcels AK, BA, BB, BC, and BD | 94 Geikie Street | Bus Parking Stall Addition & Landscaping |
2020-05-04 | Parcels AL & AZ | 96 Geikie Street | Bus Parking Stall and Retaining Wall |
2020-05-05 | Block 39, Lot 9 | 1203 Cabin Creek Drive | One room of Private Home Accommodation |
2020-05-05 | Block 42, Lot 2 | 1051 Bonhomme Street | Wood Stove |
2020-05-06 | Parcel AB | Sunwapta Falls Raft Pull Out | Utility Cabinet and Generator |
2020-04-28 | Block AR & AS | Pyramid Road | Commercial Accommodation |
2020-03-17 | Parcel GK | 2 Cottonwood Creek Road | Three new business signs |
2020-03-17 | Block 9, Lot 26 | 618 Connaught Drive | Two new business signs |
2020-03-23 | Parcel CH | 74 Connaught Drive | Ground Squirel Fence |
2020-03-23 | Block CW | 303 Pyramid Lake Road | Ice Plant Replacement |
2020-03-25 | Block 24, Lot 10 | 733 Patricia Street | As-Built Deck |
2020-03-25 | Block 24, Lot 10 | 733 Patricia Street | As-Built Main Floor Renovation |
2020-03-26 | Block 14, Lot 21 | 106 Patricia Street | Landscaping |
2020-03-26 | Parcel GL | 1 Old Lodge Road | Site Circulation and Landscaping |
2020-03-27 | Block 9, Lot 8 | 625 Patricia Street | Fire Exit/Bathroom |
2020-04-03 | Block 41, Lot 14 | 1118 Patricia Street | Roofing material change |
2020-04-06 | Block 9, Lot 24 | 622 Connaught Drive | Partition Wall |
2020-04-15 | Block 7, Lot T, 1, 14 | 105 Miette Avenue | Pool Deck |
2020-04-14 | 1/4 Section NE Sec 9 Tp 45 R1 W6M | Old Wood Lot - Hwy 93a | Seasonal Staff Accommodation |
2020-04-20 | Block 40, Lot 38 | 1101 Patricia Street | Entry Expansion |
2020-04-23 | Block 37, Lot 6 | 910 Bonhomme Street | Retaining wall, fence and stair replacement |
2020-04-23 | Block 14, Lot 8 | 115 Geikie Street | Hot Tub |
2020-02-10 | Block 14 Lot 8 | 115 Geikie Street | Garage |
2020-02-11 | Block 9, Lot 3 | 611 Patricia Street | Two business signs |
2020-02-25 | Block 39, Lots 32 & 33 | 1219 Cabin Creek Drive | Install garage door |
2020-02-27 | Block 16 Lot 35 | 212 Colin Crescent | Exterior Cladding, Shingles, and Window Replacement |
2020-03-02 | Parcel FJ | Icefield Centre Staff Accommodation | Temporary Staff Accommodation |
2020-03-02 | Block 39 Lot 9 | 1203 Cabin Creek Drive | Interior Renovation and Landscaping |
2020-03-02 | Block 23 Lot 16 | 812 Tonquin Street | Bathroom |
2020-03-10 | Block 40, Lot 43 | 1111 Patricia Street | Two rooms of private home accommodation |
2020-03-11 | Parcel FL | Icefield Centre | Café Interior Renovation |
2020-03-13 | Block 24 Lot 2 | 717 Patricia Street | Two-unit Dwelling |
2020-03-14 | Block S, Lot 56 | 60 Stan Wright Drive | One business sign |
2020-01-03 | Parcel GL | 1 Old Lodge Road | Infrastructure Upgrades |
2020-01-23 | Block 9 Lot 24 | 622B Connaught Drive | Interior Renovation |
2020-01-29 | Block 16 Lot 2 | 309 Aspen Ave | Bathroom Renovation |
2020-01-29 | Block 40 Lot 43 | 1111 Patricia Street | Deck |
2019-11-27 | Various | Jasper National Park | AC Mitigation Installation |
2019-11-28 | NW 2-41-6-W6M | Palisades Power Plant | Demolition |
2019-11-29 | Marmot Basin Ski Lifts | 518 Robson Street | Mechanical Unit |
2019-12-03 | Block 42 Lot 2 | 1033 Poplar Ave | One-unit Dwelling |
2019-12-03 | Block 9 Lot 26 | 618 Connaught Drive | Interior Renovation |
2019-12-06 | Block 20 Lots 20 and 21 | 700 Miette Ave | Interior Renovation |
2019-12-10 | Block 39 Lot 6 | 1209 Cabin Creek Drive | Door and Window Installation |
2019-12-11 | Parcel CV-1 Unit 27 | 19 Patricia Place | Woodstove |
2019-12-11 | Block 14 Lot 16 | 116 Patricia Street | Garage Demolition |
2019-12-16 | Block 10 Lot 4 | 609 Geikie Street | Four-unit Dwelling |
2019-12-18 | Parcel GK | 2 Cottonwood Creek Road | Interior Renovation |
2019-12-18 | Block 18 Lot 12 | 304 Pyramid Lake Road | Interior Renovation |
2019-12-23 | Block 9 Lot 22 | 626 Connaught Drive | Interior Renovation |
2019-09-13 | Stan Wright Parking Lot | Stan Wright Drive | Parking Lot |
2019-11-22 | Marmot Lodge | 86 Connaught Drive | Parking Lot Painting |
2019-11-22 | Marmot Basin Ski Lifts | Marmot Basin Road | Caribou Chalet Food Tent |
2019-11-22 | Block 39, Lot 6 | 1209 Cabin Creek Drive | Deck |
2019-10-24 | Block 9 Lot 27 | 6161 Connaught Drive | Roof structure replacement |
2019-10-31 | Block 20, Lots 20 & 21 | 700 Miette Avenue | New fence |
2019-10-31 | Block 28, Lot 24 | 832 Geikie Street | Replace garage shingles |
2019-11-01 | Parcel U | Pyramid Lake Road | Fireproofing and deck railing |
2019-11-07 | Parcel AK | 96 Geikie Street | Fireproofing renovation |
2019-11-12 | Block R10 | 306 Bonhomme Street | Waterslide |
2019-11-13 | Block 43 Lot 45 | 1010 Poplar Ave | One-unit dwelling |
2019-10-04 | Block 10 Lots 13-15 | 610 Patricia Street | Interior Renovation |
2019-10-08 | Parcel CO, CN, CP | 4 Aspen Gardens | Interior Renovation |
2019-10-08 | Block 39, Lot 48 | Stone Mountain Village | Playground replacement |
2019-10-08 | Block 15, Lots 2 & 3 | 107 Bonhomme Street | Handrail installation |
2019-10-08 | Block 2, Lot 7 | 213 Geikie Street | Exterior cladding |
2019-10-09 | Block 22 Lot 3 | 705 Miette Ave | Interior Renovation and Addition |
2019-10-18 | Block 7, Lot 15 | 600 Connaught Drive | Roofing replacement |
2019-10-18 | Block 4, Lot 2 | 303 Geikie Street | Exterior cladding |
2019-10-18 | Block 10 Lots 13-15 | 610 Patricia Street | One business sign |
2019-10-18 | Block 9, Lots 14 & 15 | 640 Connaught Drive | Roofing replacement |
2019-10-01 | NW1/4 Section 8 Township 45 Range 1 West of the 6th Meridian | #1 Reservoir Road | Re-shingle roof |
2019-10-01 | Block 41 Lot 5 | #1224 Patricia Street | Interior Renovation & Window Replacement |
2019-10-01 | Parcel Gl | #1 Old Lodge Road | Shaw Pedestal Replacement |
2019-10-02 | Block A Lots 4B & 5 | #36 Southview Co-op | Deck Extension |
2019-10-02 | Parcel FJ | Columbia Icefields Centre | Propane Tank Installation |
2019-10-02 | Block 40 Lot 38 | #1101 Patricia Street | Bathroom Addition |
2019-09-03 | Parcel U | SW 1/4 Sec. 33-R-45-R1-W6M | Landscaping |
2019-09-06 | Block 23 Lot 16 | 812 Tonquin Street | Home Exterior Refinishing |
2019-09-09 | Parcel GK | #2 Cottonwood Creek Road | Window Installation |
2019-08-15 | Block 34. Lot 14 | 912 Tonquin St | Replacement of roof shingles |
2019-08-16 | Block 44 Lot 50 | 1005 Poplar Ave | New house development |
2019-08-23 | Block 18, Lot 1 | 313 Balsam | House reroofing/residing |
2019-08-23 | Block 18, Lot 1 | 313 Balsam | Garage reroofing/residing |
2019-08-27 | Block 27, Lot 13 | 825 Geikie St | Building fence |
2019-08-28 | Block 40, Lot 31 | 1112 Cabin Creek Drive | Basement window |
2019-08-29 | Block 28, Lot 7 | 813 Turret Street | Re-shingle roof |
2019-07-26 | Block 24, Lot 23 | 720 Connaught Dr | Replacement of roof shingles |
2019-07-26 | Block 41, Lot 28 | 2 Brewster Cres | Replacement of roof shingles |
2019-08-07 | Block 13, Lot 11A | 121 Patricia Street | Roof replacement/chimney removal |
2019-08-14 | Block 44, Lot 64 | 1032 Lodgepole Street | Trailer renovation |
Reminder - Commercial cap – Applications due November 30, 2024
In keeping with the Jasper Community Sustainability Plan, Parks Canada (PCA) and the Municipality of Jasper (MoJ) would like to announce:
- Current available commercial floor space is 2,091.10 square metres
- All commercial floor space in S Block has been allocated.
For all developments:
- Applications with conceptual plans must be submitted to the Parks Canada by November 30, 2024
- PCA and MoJ representatives will assess applications based on established criteria;
- Applicants will receive notification if the conceptual plan has been approved or denied by January 8, 2025; and
- If approved, complete development applications are due on or before the last Monday of February 2025.
Assessment criteria and the application process are available on the Commercial floor area allocation website.
Adoption of National Building Code – 2023 Alberta Edition (NBC(AE)), National Fire Code – 2023 Alberta Edition (NFC(AE)), and National Energy Code of Canada for Buildings 2020 (NECB) – May 1, 2024
All safety code reviews for construction within Jasper National Park shall be completed using National Building Code – 2023 Alberta Edition (NBC(AE)), National Fire Code – 2023 Alberta Edition (NFC(AE)), and National Energy Code of Canada for Buildings 2020 (NECB), in additional to all other applicable codes, effective immediately. Projects may continue under the 2019 National Building Code – Alberta Edition, and the National Energy Code of Canada for Buildings 2017 supporting documentation can be provided to the Jasper Development Office that the preparation of plans and specifications was substantially completed prior to May 1, 2024.
Planning and Development Advisory Committee (PDAC)
Public hearing – Thursday, July 18, 2024
Committee of Adjustments (Planning and Development Advisory Committee)
3:30 pm, Thursday, July 18, 2024
Jasper Heritage Train Station – Grand Trunk Pacific Boardroom – 607 Connaught Drive
Meeting agenda:
- Block 41 Lot 3 – 1228 Patricia Street – Discretionary Use Application: Application to allow for the Discretionary Use of a one-bedroom Private Home Accommodation located in the Cabin Creek West One-Unit Dwelling District (CCWa).
- Block 35 Lot 31– 11 Aspen Crescent – Discretionary Use Application: Application to allow for the Discretionary Use of a two-bedroom Private Home Accommodation located in the Two-Unit Dwelling District (R2).
Parties affected by these applications are invited to make a written, or oral presentation, to the committee. Oral presentations at the meeting are limited to 5 minutes and written presentations to a maximum of 500 words. To register a written letter or register to make an oral presentation to be heard at the public hearing, please contact Parks Canada Development Office at jasperdevelopment@pc.gc.ca no later than 1:00 PM on Wednesday, July 17, 2024. Presentations that are not registered by the deadline, will not be permitted at the public hearing. If any parties affected by these applications have any questions or wish to view the applications, please contact Parks Canada Development Office at jasperdevelopment@pc.gc.ca.
Notice of decision – Thursday, July 18, 2024
Jasper National Park Committee of Adjustments (Planning and Development Advisory Committee)
Applications heard at the public meeting held at 3:30 pm on Thursday, July 18, 2024
Applications:
- Block 41, Lot 3 – 1228 Patricia Street
- Discretionary Use Application: Application to allow for the Discretionary Use of a Private Home Accommodation located in the Cabin Creek West One-Unit Dwelling District (CCWa).
Discretionary Use: Approved
- Discretionary Use Application: Application to allow for the Discretionary Use of a Private Home Accommodation located in the Cabin Creek West One-Unit Dwelling District (CCWa).
- Block 35, Lot 31 – 11 Aspen Crescent
- Discretionary Use Application: Application to allow for the Discretionary Use of a Private Home Accommodation located in the Two-Unit Dwelling District (R2).
Discretionary Use: Approved
- Discretionary Use Application: Application to allow for the Discretionary Use of a Private Home Accommodation located in the Two-Unit Dwelling District (R2).
Notices of Decision Archive
The following web archive lists all of the Planning and Development Advisory Committee Notices of Decision issued in Jasper National Park since July 15, 2021, and is searchable by date of public hearing, address, description of application, and decision. For questions on development in Jasper, please contact the Jasper Development Office at 780-852-6123 or at jasperdevelopment@pc.gc.ca
Archived Jasper National Park Notices of Decision
Date of Public Hearing | Address | Description of Application | Decision |
---|---|---|---|
2024-06-20 | Block S, Lot 7 – #29 Stan Wright Drive | Discretionary Use Application: Application to allow for the Discretionary Uses of both Professional and Office Support Services and Vehicle (Bicycle) Storage located in the Storage and Services District (S). | Discretionary Use: Approved |
2024-06-20 | Block 28, Lot 29 – 822 Geikie Street | Discretionary Use Application: Application to allow for the Discretionary Use of a Private Home Accommodation located in the One-Unit Dwelling District (R1). | Discretionary Use: Approved |
2024-04-25 | Parcel HI | Application to allow for the rezoning of this property from Community Reserve to Roads and Lanes. | Rezoning: Approved |
2024-04-25 | Parcel HG, 74 Connaught Drive | Application to allow for a Town of Jasper Land Use Policy relaxation related to staff accommodation, accessory building eave height, accessory building overall building height, fence height, and fence material in the Institutional District (I). | Variance(s): Conditionally Approved |
2024-03-21 | Block 40, Lot 11 – 1210 Cabin Creek Drive | Discretionary Use Application: Application to allow for the Discretionary Use of a Two-Bedroom Private Home Accommodation located in the Cabin Creek West Two-unit Dwelling (CCWb) District. | Discretionary use: Approved |
2024-03-21 | Block 14, Lot 27 – 102B Patrica Street | Discretionary Use Application: Application to allow for the Discretionary Use of a One-Bedroom Private Home Accommodation located in the Two-unit Dwelling (R2) District. | Discretionary use: Approved |
2024-03-21 | Block 14, Lot 27 – 102B Patrica Street | Variance Application: Application to allow for a Variance of one (1) commercial on-site parking stall located in the Two-unit Dwelling (R2) District. | Variance: Approved |
2024-02-15 | Town of Jasper Land Use Policy Amendment | Application to amend the Town of Jasper Land Use Policy to include “Community Kitchen” as a Discretionary Use in the Institutional District (I). | Amendment: Approved |
2024-02-15 | Block 35, Lot 38 – #25 Aspen Crescent | Discretionary Use Application: Application to allow for the Discretionary Use of a Community Kitchen located in the Institutional District (I). | Discretionary use: Approved |
2024-01-18 | Block S, Lot 7 – #29 Stan Wright Drive | Discretionary Use Application: Application to allow for the Discretionary Uses of Professional and Office Support Services located in the Commercial Storage and Services District (S Block). | Discretionary use: Approved |
2024-01-18 | Block 35, Lot 38 – #25 Aspen Crescent | Discretionary Use Application: Application to allow for the Discretionary Use of a Private Home Accommodation located in the Two-Unit Dwelling District (R2). | Discretionary use: Approved |
2023-12-21 | Block S, Lot 54 – 32 Stan Wright Drive | Discretionary Use Application: Application to allow for the Discretionary Uses of both manufacturing services, as well as professional and office support services located in the Commercial Storage and Services District (S Block). | Discretionary use: Approved |
2023-12-21 | Block 35, Lot 15 – 204 Bonhomme Street | Discretionary Use Application: Application to allow for the Discretionary Use of a Private Home Accommodation located in the Old Town Jasper Historic District (R2H). | Discretionary Use: Approved |
2023-12-21 | Block 28, Lots 39 and 40 – 800 Geikie Street | Variance Application: Application to allow for a Town of Jasper Land Use Policy relaxation related to site coverage, on-site parking, and maximum gross floor area as it relates to the construction of a new Two-Unit Dwelling within the One-Unit Dwelling District (R1). |
|
2023-11-16 | Block S, Lot 7 – 29 Stan Wright Drive | Discretionary use application: Application to allow for the Discretionary Uses of both manufacturing services, as well as professional and office support services located in the Commercial Storage and Services District (S Block). | Discretionary use: Approved |
2023-07-20 | Block 25, Lot 14 – 728 Patricia Street | Discretionary Use Application: Application to allow for the Discretionary Use of a Private Home Accommodation located in the R2 District. | Variance: Approved |
2023-07-20 | Block 12, Lot 5 – 709 Geikie Street | Discretionary Use Application: Application to allow for the Discretionary Use of a Private Home Accommodation located in the R2 District. | Variance: Approved |
2023-04-20 | Land Use Policy Amendment | Parks Canada has applied to amend the Town of Jasper Land Use Policy for the purpose of bringing clarification to the existing policy regarding Home Based Business (HBB). | Application to amend the Land Use Policy: Approved |
2023-01-19 | Block 7, Lot 11 – 604 Connaught Drive | The proponent has applied for a Variance with regards to the required on-site parking in the Commercial District (C1). | Variance: Approved |
2022-11-17 | Block 7 Lots 2-3-4, 601 Patricia Street | The proponent has applied for a variance with regards to the required on-site parking in the Commercial District (C1). | Variance: Approved |
2022-10-20 | Block 20 Lot 10, 719 Maligne Drive | The proponent has applied for a variance with regards to the red roof colour of the proposed garage and associated garage suite in the One-Unit Dwelling Residential District (R1). | Variance: Approved |
2022-08-18 | Block 38 Lot 2, 1123 Cabin Creek Drive | The proponent has applied for a variance to normalize the existing condition(s) of the site: As-Built below grade entrance to the basement; reduction of setback for existing accessory building; and an increase to the allowable accessory building eave height in the CCWc District. | Variance: Approved |
2022-06-16 | Block 9 Lot 19, 632B Connaught Drive | Application to add the Discretionary Use of Equipment Rentals within the C1 Commercial District. | Discretionary Use: Approved |
2022-06-16 | Block 9 Lot 26, 618 Connaught Drive | Application to add the Discretionary Use of Entertainment Establishment within the C1 Commercial District. | Discretionary Use: Approved |
2022-06-16 | Block 5 Lot 15, 4 Pyramid Lake Road | Application to add the Discretionary Use of Drinking Establishment within the C1 Commercial District. | Discretionary Use: Approved |
2022-04-21 | Block 9 Lot 22, 626 Connaught Drive | The proponent has applied to add the Discretionary Use of Eating Establishment to the Commercial District (C1) in order to accommodate a new restaurant. | Discretionary Use: Approved |
2022-04-21 | Block 10 Lots 12 and 13, 616 Patricia Street | The proponent has applied to add the Discretionary Use of Eating Establishment to the Commercial District (C1) in order to accommodate a new restaurant. | Discretionary Use: Approved |
2022-02-17 | Block S Lot 21, 53 Stan Wright Drive | The proponent has applied to add the Discretionary Use of Manufacturing Services to this property located within the Block S District in order to accommodate a Commissary Kitchen | Discretionary Uses: Approved |
2022-02-17 | Portion of Open Space located in Stan Wright Industrial Area | The proponent has applied to rezone a portion of land from Open Space District to Institutional, and to add the Discretionary Uses of Parking Lot and Utilities in order to accommodate a Parking Lot, Bulk Water / Sanitary Station, and Community Recycling Centre. | Rezoning: Approved Discretionary Uses: Approved |
2021-12-16 | Block 7, Lot 11 – 604 Connaught Drive | Request for Discretionary Use of Eating Establishment in the Commercial District C1 | Discretionary Uses: Approved |
2021-11-18 | Block 10, Lots ½ 13, 14, 15 – 610 Patricia Street | Request for Discretionary Use of Eating Establishment in the Commercial District C1 | Discretionary Uses: Approved |
2021-08-19 | Block S, Lot 29, 48 Stan Wright Drive | Application for a Discretionary Uses in the Storage and Services District (Block S): Kennel Services; Retail Services Incidental to the Primary Use | Discretionary Uses: Approved |
2021-08-19 | Block S, Lot 29, 48 Stan Wright Drive | Application to reduce required on-site parking from 9 to 3 stalls | Variance Request: Conditionally approved Condition: 5 stalls are provided on site. Tandem stalls are acceptable at the side of the building, if prioritized for staff. |
2021-08-19 | Block 42, Lot 25, 1033 Poplar Ave | Application to vary fence material requirements | Variance Request: Approved |
2021-07-15 | Block 9, Lot 1, 611 Patricia Street | Application for a Discretionary Use in the Commercial District (C1): Equipment Rental | Discretionary Use: Approved |
2021-07-15 | Block R11, 302 Elm Avenue | Application for a Discretionary Use in the Institutional District (I): Childcare Facilities | Discretionary Use: Approved |
2021-07-15 | Block R11, 302 Elm Avenue | Application for a Discretionary Use in the Institutional District (I): Childcare Facilities | Discretionary Use: Approved |
Town of Jasper Land Use Policy Amendment Application for PDAC - March 22, 2023
Application to the Planning and Development Advisory Committee
Executive summary
Parks Canada has initiated a process to amend the Private Home Accommodation (PHA) requirements as stated in the Town of Jasper Land Use Policy. The intent of the proposed PHA amendments is to address previous permitting inconsistencies and facilitate clear, consistent and fair implementation of the PHA permitting process, for the benefit of current and future PHA operators, the community and visitors.
Background on conceptual changes
During the 2018 consultations for the proposed Land Use Planning Regulation the Municipality and participants requested a separate meeting be arranged to discuss local housing issues in the Park community and options to permit more rental housing inside the townsite. Parks Canada and the Municipality jointly funded a consultant, met with the Chamber of Commerce and the Jasper Home Accommodation Association (JHAA), in February of 2019, and hosted a public forum on March 14, 2019. Topics discussed at the forum included: Options for updating Jasper’s Zoning Regulations; considerations for Accessory Dwelling Units; and Private Home Accommodations. From the What We Heard Report, based on this 2019 consultation (available at: Jasper National Park Public Notices), feedback specific to Private Home Accommodations was considered and on May 12, 2022 twelve concepts for PHA policy changes were proposed. After receiving preliminary feedback, the proposal was withdrawn.
In July of 2022 Parks Canada met with both the JHAA and the Municipality to obtain feedback on PHA changes. From the meetings, and the 2019 feedback, eight conceptual PHA policy changes were put forward in December 2022. A six-week public consultation process on the “Private Home Accommodation Conceptual Policy Changes” resulted in a PHA Concept Policy Changes What We Heard Report.
The consultation process was advertised in the Fitzhugh newspaper and posted on the Parks Canada Public Notice webpage and the What We Heard Report is available on the Jasper National Park Public Notices.
In consideration of the feedback, the following three concepts will not be amended in the policy at this time: PHA Parking (Not Obstructed); PHA On-site Parking Use; and PHA Discretionary Use Permit 3-year Term. These concepts remain important to address and Parks Canada will further consult with both the JHAA, and the Municipality of Jasper, on the creation of PHA Guidelines and a PHA Compliance Strategy.
Proposed policy changes
This application to amend the Town of Jasper Land Use Policy includes the five remaining PHA concepts that have been consulted on as well as several policy clarifications.
Note to reader:
- The Explanatory notes are solely to serve as a record of the intent of each amendment but will not form part of the formal Land Use Plan amendment.
- Kitchens prohibited in PHAs
- Section 30.06 Private Home Accommodation Additional Requirements subsection (a) is hereby amended by the addition of:
“(vii) not contain a kitchen, unless constructed as an approved secondary suite through an approved Parks Canada Development Permit and a Parks Canada Building Permit process” - PHA gross floor area
- Section 3.02 Definitions subsection (a) is hereby amended by the addition of:
“private home accommodation area” means the gross floor area within the dwelling attributed to the use of the Private Home Accommodation which may include, but not limited to, any bedrooms, bathrooms, entrances or hallways, sitting rooms, storage areas, or other spaces.” - Section 30.05 Home Based Business Specific Requirements (a) All Home Based Businesses shall comply with: … (iv) is hereby replaced with:
“(iv) a Home Based Business, excluding a Private Home Accommodation, shall occupy no more than 10% of the gross floor area of a dwelling unit including associated storage of materials, goods, supplies or equipment” - Section 30.06 Private Home Accommodation Additional Requirements (a) In addition to all of the Home Based Business requirements, a Private Home Accommodation shall: … (vi) is amended with the addition of:
“(vi) have a total Private Home Accommodation Area that must not exceed 45% of gross floor area of the dwelling it is located within” - Compliance inspections (PHA compliance deadline)
- Section 31.05 Inspection, including subsection (a), is hereby deleted in its entirety;
- Section 5.17 Enforcement subsections (b) and (d) are replaced with:
"(b) The superintendent may suspend or revoke a permit issued under these Policies where it is found that a development, construction, or the use of the land or building, in whole or in part, is not in accordance with any of the following conditions:
- the Act and regulations;
- the terms and conditions of a permit issued under these Policies;
- if the permit was issued, in the opinion of the superintendent, on the basis of substantial incorrect information or misrepresentation by the applicant; or
- the permit was issued in error.
...
- stop any construction on the building or the use of the land or building in whole or in part as directed by the notice;
- demolish, remove or replace the building; or
- carry out any other actions required by the notice so that the building or use of the land or the building is made to comply with the provisions of the notice.”
- Exterior entrance restrictions
- Section 3.02 Definitions (a) “vestibule” to be deleted
- Section 15.06(h)(iv) deletion of sub-sub-subsections (1), (2), (3), and (4) will remove the exterior entrance restrictions from the One-unit Dwelling District (R1)
- Section 16.06(i)(iv) deletion of sub-sub-subsections (1), (2), (3), and (4) will remove the exterior entrance restrictions from the Two-unit Dwelling District (R2)
- Section 17.06(h)(iv) deletion of sub-sub-subsections (1), (2), (3), and (4) will remove the exterior entrance restrictions from the Old Town Jasper Historic District (R2H)
- Section 20.06(g)(iv) deletion of sub-sub-subsections (1), (2), and (3) will remove the exterior entrance restrictions from the Compact Lot Dwelling District (R4)
- Section 21.06(i)(iv) deletion of sub-sub-subsections (1), (2), (3), and (4) will remove the exterior entrance restrictions from the Cabin Creek West One-unit Dwelling District (CCWa)
- Section 22.06(h)(iv) deletion of sub-sub-subsections (1), (2), (3), and (4) will remove the exterior entrance restrictions from the Cabin Creek West Two-unit Dwelling District (CCWb)
- Section 23.06(j)(ii) deletion of sub-sub-subsections (1), (2), (3), and (4) will remove the exterior entrance restrictions from the One-unit Dwelling District (R1)
- Discretionary use permit
- Section 1.07 Non-Conforming Uses and Buildings subsection (a) and (g) is replaced with:
- “(a) if a Discretionary Use Permit, development permit, or a building permit has been issued on or before the day on which these Policies, or an amendment thereto, comes into force and the Policies or amendment would make the use or development in respect of which the permit was issued a non-conforming use or a non-conforming building, the permit continues in effect in spite of the coming into force of these Policies.
- ...
- (g) A permit issued for a home based business discretionary use shall be terminated should the applicant vacate the property for which the permit was issued.”.”
- Section 3.02 Definitions subsection (a). is hereby amended by the addition of:
“discretionary use permit” means a document issued by the superintendent or their delegate under this Policy that authorizes a discretionary use which may include a written letter of decision, a plan or drawings, specifications, or other documents as applicable;” - Section 5.05 Procedure for Other Development and Discretionary Use Applications subsection (a) is hereby replaced with:
"(a) Following the receipt of a complete:
- development permit application for a permitted use requiring a Variance; or
- Discretionary Use permit application, excluding a Home Based Business that does not involve client visitation”
- Section 30.02 Approval Required subsection (b) is hereby replaced with:
“(b) No person shall operate a Home-Based Business without a valid Discretionary Use Permit." - Section 30.03 is hereby replaced with:
“Section 30.03 Discretionary Use Permit Application Requirements for Home Based Businesses
(a) Every application for a Discretionary Use Permit for a Home Based Business shall be made on a form provided by the superintendent, and be signed by the applicant.
(b) The superintendent shall refuse to accept a Discretionary Use Permit application where the information required in the following has not been supplied or where, in the opinion of the superintendent, the quality of the material supplied is inadequate to properly evaluate the application.” - Section 30.04 subsection (c), (d), (e), and (f) are hereby replaced with:
- "(c) Discretionary Use Permits for a Home Based Businesses are not transferable to between properties or lessees.
- (d) A Home Based Business Discretionary Use Permit, or employment by a Home Based Business, shall not grant eligible resident status.
- (e) A home based business may employ a maximum of one non-resident employee, in addition to the holder of the Discretionary Use Permit.
- (f) Any changes to an existing Home Based Business Discretionary Use Permit shall require a re-application for a new Discretionary Use Permit.”
- Section 30.05 Home Based Business Specific Requirements subsection (a) is hereby replaced with:
“(xii) if required, the area of a dwelling unit used for a Home Based Business may be inspected by inspection agency approved by the superintendent, and must pass the inspection prior to a Home Based Business Discretionary Use Permit being approved. The inspection shall ensure compliance with these Policies, and any other applicable codes and regulations.” - Policy clarifications
- Section 3.02 Definitions subsection (a) is hereby amended by replacing the definition of “home based business” with:
““home based business” means the secondary use of a residential dwelling for an occupation, office, trade, craft, or private home accommodation, for gain or support, conducted by a permittee who occupies the dwelling as a principal residence;” - Section 3.02 Definitions subsection (a) is hereby amended by replacing the definition of “private home accommodation” with:
““private home accommodation” means a home based business which provides commercial visitor accommodation on a per night basis.” - Section 30.02 Approval Required subsection (a) is hereby replaced with:
“(a) A Home Based Business is a Discretionary Use and all requirements of these Policies with respect to a Discretionary Use shall apply.” - Section 30.03 (c) “Discretionary Use Approval” subsections (i) and (ii) are hereby replaced with:
“(i) A Home Based Business that involves client visitation requires the application to be reviewed before the Planning and Development Advisory Committee to obtain a Discretionary Use Permit.
(ii) A Home Based Business, that does not involve client visitation, may be issued a Discretionary Use Permit without appearing before the Planning and Development Advisory Committee, if, in the opinion of the Superintendent, the business clearly conforms to all policy requirements.” - Section 30.03 (d) Every application for a Discretionary Use Permit shall be accompanied by: sub-subsection (i) is hereby replaced with:
“(i) written confirmation that the applicant is the lessee of the site, or for uses other than Private Home Accommodation, a letter of authorization from the lessee of the site authorizing the applicant to apply on the lessee’s behalf;” - Section 30.03 (d) “Every application for a Discretionary Use Permit shall be accompanied by:” sub-subsection (iv) is hereby replaced with:
“(iv) dimensioned and scaled: floor plans of the dwelling unit, floor plans of the area of the dwelling to be used for the Home Based Business; and, site plan of any additional on-site parking for the Home Based Business if required; and” - Section 30.04 General Requirements is hereby replaced with “30.04 General Home Based Business Requirements”.
- Section 30.04 (b) is hereby replaced with:
“(b) No more than one home based business shall be permitted per dwelling unit, if one of the businesses involves client visitation. - Section 30.05 Specific Requirements is hereby replaced with:
“30.05 Home Based Business Specific Requirements” - Section 30.05 (a) All Home Based Businesses shall comply with the following (vii) is replaced with:
“(vii) for a site not abutting a lane, a Home Based Business required on-site parking stall may be located within the front setback if it does not interfere with other requirements of this Policy including the required front yard soft landscaping for the site;” - Section 30.05 Home Based Business Specific Requirements (a)(ix) is hereby replaced with:
“(ix) no signs advertising home based businesses, other than those required by a Private Home Accommodation, shall be permitted” - Article 31.00 Private Home Accommodation is hereby amended by renumbering to Section 30.06 Private Home Accommodation Additional Requirements.
- Section 30.06 (a) is hereby replaced with:
“Section 30.06 Private Home Accommodation Additional Requirements
(a) In addition to all Home Based Business requirements, and the District Development Requirements in which the Private Home Accommodation is located, a Private Home Accommodation shall:” - Section 31.02 (a)(i), (ii), and (iv) are hereby amended by renumbering to 30.06(a)(i), (ii), and (iv)
- Section 31.02(a)(iii) is hereby replaced with 30.06(a)
“(iii) Persons, excluding corporate entities, operating a Private Home Accommodation shall be the lessee of record and shall reside in the Dwelling Unit as their primary residence;” - Section 31.02 (a)(v) and (vi) are hereby deleted in their entirety
- Section 31.03 Development Requirements (a), (b), (c) and (d) are hereby renumbered to 31.06 (vii), (viii), (ix), and (x)
- Section 31.04 Licensing, and its subsections (a) and (b) are hereby deleted.
- Section 31.04 (c) is hereby renumbered to 30.06 (xi)
Proposed policy amendments:
Explanatory note:
The intent is to clarify the existing policy restricting a PHA from having a kitchen unless the PHA is contained within a secondary suite. With the adoption of the Interim Policy for Secondary Suites in the Town of Jasper in 2020 this new option to have a PHA with a Kitchen is now be possible. Public Feedback specific to “No limitation of cupboards / refrigerator size” was well supported; therefore, Parks Canada will not propose an amendment to the Policy in this regard and will consult with both the JHAA, and the Municipality of Jasper, and the community to address this further through creation of PHA Guidelines and a PHA Compliance Strategy.
Proposed policy amendment: Private Home Accommodation Area definition and limitation to a maximum of 45% of the dwellings gross floor area is achieved through the following amendments:
Explanatory note:
The intent is to clarify that a Private Home Accommodation Area may occupy up to 45% of the dwellings gross floor area.
Proposed policy amendments: The deletion of section 31.05 Inspections including subsection (a) will remove this Private Home Accommodation Permit 60-day enforcement deadline.
Explanatory note:
The intent is to clarify that PHA enforcement will be aligned with the existing enforcement actions as stated in section 5.17 Enforcement. Section 5.17 is also amended to include “use” as this concept is proposed to be separated from the current definition of Development (see Discretionary Use Permit below). Further consultation on a PHA Compliance Strategy with the JHAA and the Municipality of Jasper is required in addition to these policy changes.
Proposed policy amendments: Current Policy restricts one-unit and two-unit dwellings to: a maximum of 2 exterior entrances per dwelling; no exterior stairway to the second floor permitted; no enclosed entrance hallways (vestibules) permitted; and no independent access to basements permitted. Deletion of the following sections will remove these Exterior Entrance Restrictions:
Explanatory note:
The intent is to remove these current exterior entrance policy restrictions to ensure conformity for all one-unit and two-unit dwellings rather than grant exceptions to PHAs only.
Proposed Policy Amendments: The following amendments will add in the new Discretionary Use Permit type:
Many of the proposed amendments are intended to provide general policy clarification on existing policy items as well as adopting some existing practices into policy.
Explanatory note:
The intent is to add clarity that the person who obtained the home based business permit, the permittee, must also reside in the dwelling.
Explanatory note:
The intent is to clarify that a PHA is a home based business; update the antiquated wording of the existing Land Use Policy by removing “transient paying guest” terminology to visitor accommodation; and the remove the ambiguous statement that it can be within a “one or two-dwelling unit”.
Explanatory note:
The intent is to adjust the current wording that states “a home based business shall be regulated as a discretionary use” by simplifying it to state that it is “is” a discretionary use.
Explanatory note:
The intent of the amendment is to simplify the policy by eliminating the need to define a Type 1 or Type 2 Home Based Business as it could simply state a Home Based Business with or without client visitation. This is specific to a Home Based Business that involves client visitation, which is required to go through the PDAC process and provide an on-site parking stall.
Explanatory note:
The intent is to clarify that the current requirement of a “certificate of title” for the site is not required as Parks Canada has record of who the lessee is. Replacing this requirement, the current practice of requiring the applicant to state if they are the lessee, or they have an authorization letter from the lessee, as part of the Home Based Business Discretionary Use Permit application process is proposed.
Explanatory note:
The intent is to clarify the required dimensioned and scaled plans for a Home Based Business in order to determine the ratio of the home based business’ floor area to the dwellings gross floor area as well as providing a site plan demonstrating the additional parking if required.
Explanatory note:
The intent of the amendment is to simplify the policy by eliminating the need to define a Type 1 or Type 2 Home Based Business as it could simply state a Home Based Business with or without client visitation.
Explanatory note:
The intent of the amendment is to clarify that a required parking stall for a Home Based Business, located in an area without back alley access, may be located in the front setback as long as it does not interfere with the site’s required front yard’s soft landscaping.
Explanatory note:
The intent is to clarify that a PHA is exempted from the Home Based Business signage restriction.
Explanatory note:
The intent is to clarity that a Private Home Accommodation is a Home Based Business and should be a section under the Home Based Business Article. This also deletes the existing Article 30.06 Inspections.
Explanatory note:
The intent is to combine existing Sections 31.01 (a) and 31.02 (a)(i) and (v) into a single new subsection.
Explanatory note:
The intent is to clarity that a Private Home Accommodation is a Home Based Business and should be a section under the Home Based Business Article. This also deletes the existing Article 30.06 Inspections.
Explanatory note:
The intent is to clarify that the permittee cannot be a corporate entity and that they must reside in the dwelling unit as their primary residence.
Explanatory Note:
The intent is to clarify that sub-subsection (v) was amalgamated in Section 30.06(a) and sub-subsection (vi) regarding operating a PHA shall not provide eligible residency is redundant as it is stated the same in the Home Based Business section 30.04(d)
Explanatory Note:
The intent is to clarity that a Private Home Accommodation is a Home Based Business and should be a section under the Home Based Business Article. This also deletes the existing Article 30.06 Inspections.
Explanatory Note:
To provide clarity that these subsections already exist in the Home Based Business Sections 30.02 (b) and 30.04(c).
Explanatory Note:
The intent is to clarity that a Private Home Accommodation is a Home Based Business and should be a section under the Home Based Business Article. This also deletes the existing Article 30.06 Inspections.
Public notice – Private Home Accommodation
Private Home Accommodation policy amendment process
Parks Canada has initiated a process to amend the Private Home Accommodation (PHA) requirements as stated in the Town of Jasper Land Use Policy. The intent of the proposed PHA amendments is to address previous permitting inconsistencies and facilitate clear, consistent and fair implementation of the PHA permitting process, for the benefit of current and future PHA operators, the community and visitors.
Background
In March 2019 Parks Canada began an extensive public consultation on a number of issues—including PHAs—pertaining to residential housing shortages in the Jasper townsite. Consultations in 2019 included initial meetings with the Chamber of Commerce on February 21, the Private Home Accommodation Association on February 28, and a well-attended public forum on March 14. From this initial consultation process the What We Heard Report was made available to the public in September 2019, informing several action items for Parks Canada to implement.
The following year, Parks Canada issued Public notice - March 2020 stating that Private Home Accommodation applications would not be accepted after April 30, 2020, and that Parks Canada and the Municipality of Jasper would work together to determine what changes, if any, would be made to PHAs as a result of public feedback received in the 2019 consultations.
Following the initial consultations, draft amendments to the PHA requirements in the Town of Jasper Land Use Policy were developed; these amendments directly reflected public comments received and summarized in the What We Heard Report. The proposed policy changes included life safety requirements, policy clarity, and protection of residential spaces within the community, and were shared with the Jasper Home Accommodation Association (JHAA), PHA operators, the Municipality of Jasper, and the public in March 2022. After hearing concerns, including those raised by JHAA and PHA operators, Parks Canada withdrew the proposal.
On July 22, 2022 Parks Canada met with the JHAA to better understand the association’s concerns and to seek their input for the development of a revised policy. In addition, Parks Canada invited the Municipality of Jasper (as the PHA business licence authority) to provide input to be considered in the development of a revised policy.
The proposed policy changes were made publicly available on December 15, 2022 through a direct mailing to members of the JHAA, an ad in the local newspaper, and a notice on this webpage.
Next steps
Interested parties may provide feedback on the proposed policy changes to jasperdevelopment@pc.gc.ca until January 31, 2023.
Feedback pertaining to the current PHA proposed policy changes will be publicly available and a What We Heard report will be prepared and posted on the Jasper National Park website under Public Notices.
The feedback will be reviewed and evaluated to formulate a PHA land-use amendment package for submission to the Planning and Development Advisory Committee (PDAC). PDAC meetings are open to all and provide a formal public hearing process. Anyone affected by a development being considered by the committee may ask to speak at the public hearing. Information on how to participate in a PDAC meeting may be found here. Following the meeting, the PDAC will submit written recommendations to the Jasper Field Unit Superintendent.
The PHA land-use policy amendment package is expected to be on the agenda of the March 16, 2023 PDAC meeting. Public notices of upcoming PDAC meetings and agenda items are published on the Jasper National Park website and in the Fitzhugh newspaper a minimum of two weeks in advance.
Pending the outcome of the PDAC meeting, Parks Canada anticipates the PHA land-use policy amendments being completed by March 31, 2023, and to resume accepting new PHA development permit applications shortly thereafter.
Media Inquiries
Public Relations and Communications
Jasper National Park
Tel: 780-852-6109
Email: jnpmedia@pc.gc.ca
Private Home Accommodation conceptual policy changes
Parks Canada is looking for feedback regarding proposed conceptual Private Home Accommodation (PHA) changes in the Town of Jasper Land Use Policy (Policy). The intent of the PHA proposed amendments is to address previous permitting inconsistencies and to facilitate clear, consistent, and fair implementation of the PHA permitting process moving forward for the benefit of the current and future PHA operators; the community; and our visitors. PHA operators, that have a valid Municipality of Jasper Private Home Accommodation Business Licence, are considered to have an active Parks Canada Private Home Accommodation Use Permit which will remain in effect, as approved, with no expiry date.
The Municipality of Jasper (as the PHA Business Licence Authority) and the Jasper Home Accommodation Association (representing PHA operators) were engaged to help Parks Canada better understand PHA fundamentals and possible improvements. Now we would like to extend the opportunity to all community members, and the general public to review and provide preliminary feedback on the PHA Conceptual Policy Changes proposed below. At the end of this process, feedback will be reviewed and evaluated to assist in formulation of the Parks Canada PHA Land Use Amendment Package to be formally submitted to the Planning and Development Advisory Committee (PDAC) for the formal public hearing process (see weblink below).
Please provide feedback on the PHA Conceptual Policy Changes to jasperdevelopment@pc.gc.ca no later than January 31, 2023 in order for Parks Canada to apply for a PHA specific land use policy amendment to be heard at the March 16, 2023 Planning and Development Advisory Committee public hearing. We hope to have the PHA amendments formalized by March 31, 2023 and resume accepting new PHA applications shortly thereafter.
PHA conceptual policy changes include:
Requirement | Action | Issue | Proposed change |
---|---|---|---|
Kitchens prohibited in PHAs | Policy clarification | Kitchens were inferred as not being acceptable in a PHA as a dwelling may only have one Kitchen and a PHA is an area within a dwelling. Kitchen is defined in policy and one of the defining elements includes an area used for the preparation of food. There has been confusion regarding what appliances, or cupboards, are permitted in a PHA. | Kitchens located in a PHA shall be expressly stated as prohibited, with the exception of a PHA located in a Secondary Suite approved by a Parks Canada Development and Building Permit process. A beverage preparation area (may include sink, mini fridge, one upper / lower standard cabinet, microwave, kettle, coffee maker) for all residential dwellings is acceptable if accompanied by an attestation declaring the preparation of food will not be facilitated. |
PHA Gross Floor Area (GFA) definition and limitation | Policy addition | PHAs currently are defined in policy as PHA Bedroom(s) whereas most PHA Areas also include a bathroom, sitting room, exterior entrance and other areas. The policy currently limits the floor area of Home-Based Businesses (which include PHAs) to 10%, where applicable, but does not clarify if this is applicable to PHAs. PHAs are listed as a secondary use in a dwelling, but should not have an area larger than the remaining residential space in the dwelling. | The definition of PHA Area (including bedroom, bathroom, sitting room, exterior entrance and other areas associated with the PHA) will be added and it will be clarified that it is limited to a maximum of 45% of the dwelling unit’s Gross Floor Area. |
PHA parking (not obstructed) | Policy clarification | Current Policy states that additional on-site PHA parking stalls are required, in addition to the site’s required on-site parking, but does not state the PHA Parking stall(s) must not obstruct each other or the other required on-site parking of the site. In practice this has made it functionally difficult to ensure a site is using its required parking spaces to lessen the impact on the public street parking. | Clarification that PHA on-site parking stalls may not block (tandem parking) each other or other on-site required parking stalls. For properties with no lane access, PHA parking stalls may still be located in the front setback, provided they are not in tandem with other required on-site parking stalls or at the expense of required soft landscaping. |
PHA on-site parking use | Policy clarification | The current Policy requires a PHA to provide additional on-site parking (one on-site parking spot per PHA Bedroom) but does not state that the additional PHA on-site parking stall is to be used by the PHA guests. | The Policy will be amended stating that PHA operators are responsible for their PHA guests to use the on-site PHA parking stalls. |
PHA DU 3-year term | Policy addition | Previous public consultation specific to PHAs suggested compliance inspections should be conducted on a regular basis rather than on the current complaint basis. | New PHA Discretionary Use permits will be issued for a maximum term of 3 years. Upon expiry, a new permit must be obtained, demonstrating compliance with all requirements. A PHA Compliance Policy for existing PHAs, that have no permit expiry date, will also require an inspection every three years. |
Compliance inspections | Policy removal | Current Policy has a specific PHA requirement for compliance issues to be rectified within 60 days. This has been problematic to enforce and is inconsistent with the general compliance Policy for all other permits including other home based businesses. | Removal of this PHA-specific compliance deadline will align it with the existing permit compliance policy. |
Restriction: of maximum 2 exterior entrances per dwelling Restriction of exterior stairway to second floor Restriction of enclosed entrance hallway Restriction of independent access to basement |
Policy restriction removal | PHA operators have identified that having an independent PHA entrance is a key component to the offer for safety and convenience. Continuing to restrict other home owners, except PHA operators, does not seem to be fair and equitable. | Remove restriction and require an attestation to ensure independent exterior access will not be used for a non-approved dwelling. |
Discretionary use permit | New policy | Current policy considers a Development Permit as the approval for either a Development (physical construction) or a Discretionary Use (use). The requirements for these types of permits are very different and this has caused confusion. | Addition of Discretionary Use Permit definition distinguishing it from a Development (physical construction) permit. |
Related webpages
Private Home Accommodation conceptual policy changes - What We Heard Report
Jasper National Parks Private Home Accommodation Feedback on Conceptual Policy Changes
Prepared by Parks Canada, February 8, 2023
What We Heard Report
Executive summary
Parks Canada has initiated a process to amend the Private Home Accommodation (PHA) requirements as stated in the Town of Jasper Land Use Policy. The intent of the proposed PHA amendments is to address previous permitting inconsistencies and facilitate clear, consistent and fair implementation of the PHA permitting process, for the benefit of current and future PHA operators, the community and visitors.
Background on conceptual changes
The “Private Home Accommodation Policy Amendment Process” began in 2019 and is available on the Jasper National Park Public Notices. Part of this process was a public consultation on “Private Home Accommodation Conceptual Policy Changes” based on 8 concepts which was made publicly available on December 15, 2022 through a direct mailing to members of the Jasper Home Accommodation Association (JHAA), two advertisements in the local newspaper, and a notice on the Jasper National Park Public Notices webpage. This consultation closed on January 31, 2023 and the intent of this report is to summarize the comments and suggestions received through this process.
Who we heard from
We received a total of 33 responses:
- 29 from PHA operators
- 3 from Jasper residents that are non-PHA operators
- 1 from a visitor
Conceptual policy changes and feedback
The following are the concepts consulted on and the summarized feedback for each:
- Kitchens prohibited in PHAs
- No cooking in a PHA unless the PHA is within a Secondary Suite (4 comments)
- No limitation on cupboards / refrigerator size (6 comments)
- A kitchenette should be allowed in a PHA (6 comments)
- PHA gross floor area
- PHA parking (not obstructed)
- PHA on-site parking use
- PHA discretionary use 3-year permit term
- Future compliance strategy
- Current enforcement of PHAs is inadequate and that a complaint driven model is ineffective and unfair to neighbors. (4 comments)
- Encouraging regular inspections to ensure compliance (5 comments)
- Concerns that the policy shouldn't be amended without knowing what a future compliance policy would look like; and questioned possible associated fees (3 comments)
- PHA compliance deadline
- Exterior entrance restrictions
- Discretionary use permit
- Other comments
- Supporting the grandfathering of existing PHA Operators;
- The importance of PHAs to the community and to visitors;
- Concerns regarding PHAs and affordability of homes;
- The lack of direct consultation with PHA Operators;
- Support of land use and planning going to the Municipality of Jasper;
- Confusing communications;
- That the 2019 What we Heard Report which indicated that 58% of the comments called for increased PHA regulation was not a call to action;
- Suggestions of alternative methods to regulate commercial density in residential neighborhoods;
- The belief that these proposals are a step in the right direction;
- Permitting PHAs without a cap is not sustainable;
- Concern about future possible changes;
- Suggestions to analyze PHA parking alignment on an individual basis.
Parks Canada proposed change: Kitchens located in a PHA shall be expressly stated as prohibited, with the exception of a PHA located in a Secondary Suite approved by a Parks Canada Development and Building Permit process. A beverage preparation area (may include sink, mini fridge, one upper / lower standard cabinet, microwave, kettle, coffee maker) for all residential dwellings is acceptable if accompanied by an attestation declaring the preparation of food will not be facilitated.
Feedback received from public: We received a total of 16 comments regarding kitchens which fall into three categories:
Parks Canada proposed change: The definition of PHA Area (including bedroom, bathroom, sitting room, exterior entrance and other areas associated with the PHA) will be added and it will be clarified that it is limited to a maximum of 45% of the dwelling unit’s Gross Floor Area.
Feedback received from public: We received a total of 4 comments regarding adding the PHA Gross Floor Area definition; all four comments were supportive of this proposed policy change.
Parks Canada proposed change: Clarification that PHA on-site parking stalls may not block (tandem parking) each other or other on-site required parking stalls. For properties with no lane access, PHA parking stalls may still be located in the front setback, provided they are not in tandem with other required on-site parking stalls or at the expense of required soft landscaping.
Feedback received from public: We received a total of 12 comments regarding restricting tandem parking for PHA stalls. All 12 comments were not in support of moving forward with this restriction. Two people suggested looking at parking in a neighbourhood-specific context.
Parks Canada proposed change: The Policy will be amended stating that PHA operators are responsible for their PHA guests to use the on-site PHA parking stalls.
Feedback received from public: We received a total of 12 comments regarding PHA operators be responsible to ensure their PHA guests use the on-site PHA Parking Stalls. The comments were evenly split with 6 in favour and 6 not in favour.
Parks Canada proposed change: New PHA Discretionary Use permits will be issued for a maximum term of 3 years. Upon expiry, a new permit must be obtained, demonstrating compliance with all requirements. A PHA Compliance Policy for existing PHAs, that have no permit expiry date, will also require an inspection every three years.
Feedback received from public: We received a total of 12 comments regarding new PHA Discretionary Use permits to be issued for a maximum term of 3 years. All twelve comments were opposed to the three-year term. Two comments suggested that a longer term of 5 or 10 years would be more acceptable.
Background: As part of the PHA Discretionary Use 3-year term concept and from general comments, there was a lot of feedback received specific to compliance inspections and as such this concept was given its own category.
Feedback received from public: We received a total of 12 comments regarding compliance inspections which fall into three categories:
Parks Canada has assured the JHAA that prior to any changes being made, Parks Canada will meet with the JHAA and the Municipality of Jasper (as the PHA Business Licence authority and as the body that controls and manages the public streets and alleys), to specifically discuss a future PHA Compliance Strategy. The intent of a future compliance strategy is to ensure the three parties work together on the who, what, where, and when inspections and compliance actions would take place. Once a draft strategy is formulated, the general public will be consulted before finalizing the strategy.
Parks Canada proposed change: Currently Private Home Accommodations have a specific policy enforcement deadline of 60 days. Removal of this PHA-specific compliance deadline will revert PHA enforcement to be covered under the existing general permit enforcement policy.
Feedback received from public: We received a total of 3 comments regarding Removal of this PHA-specific compliance deadline. All three comments were supportive of this removal.
Parks Canada proposed change: Current Policy restricts one-unit and two-unit dwellings to: a maximum of 2 exterior entrances per dwelling; no exterior stairway to the second floor permitted; no enclosed entrance hallways (vestibules) permitted; and no independent access to basements permitted. It is proposed to remove these restrictions and require an attestation to ensure independent exterior access will not be used for a non-approved dwelling.
Feedback received from public: Seven comments were received regarding the removing of the listed entrance restrictions all of which were supportive.
Parks Canada proposed change: Addition of Discretionary Use Permit definition distinguishing it from a Development (physical construction) permit.
Feedback received from public: Three comments were received on this concept including two supporting the addition of the Discretionary Use Permit and one "no comment".
Many other comments were received that were not directly related to the concepts listed on this particular consultation. These comments include:
Next steps
Reviewing the feedback
The feedback will be reviewed and evaluated to formulate a PHA land-use amendment package for submission to the Planning and Development Advisory Committee (PDAC). PDAC meetings are open to all and provide a formal public hearing process. Anyone affected by a development being considered by the committee may ask to speak at the public hearing. Information on how to participate in a PDAC meeting may be found here. Following the meeting, the PDAC will submit written recommendations to the Jasper Field Unit Superintendent.
The PHA land-use policy amendment package is expected to be on the agenda of the March 22, 2023 PDAC meeting. Public notices of upcoming PDAC meetings and agenda items are published on the Jasper National Park website and in the Fitzhugh newspaper a minimum of two weeks in advance.
Some responses contained questions, which will be responded to individually.
When will the policy changes take effect?
Pending the outcome of the PDAC meeting, Parks Canada anticipates the PHA land-use policy amendments being completed by March 31, 2023, and to resume accepting new PHA development permit applications shortly thereafter.
Private Home Accommodation policy amendment action summary
Jasper National Parks Private Home Accommodation Parks Canada Policy Amendment Action Summary
Prepared by Parks Canada, February 16, 2023
Parks Canada Action Summary
Executive summary
Parks Canada has initiated a process to amend the Private Home Accommodation (PHA) requirements as stated in the Town of Jasper Land Use Policy. The intent of the proposed PHA amendments is to address previous permitting inconsistencies and facilitate clear, consistent and fair implementation of the PHA permitting process, for the benefit of current and future PHA operators, the community and visitors.
Background on conceptual changes
The “Private Home Accommodation Policy Amendment Process” began in 2019 and is available on the Jasper National Park Public Notices. Part of this process was a public consultation on “Private Home Accommodation Conceptual Policy Changes” based on 8 concepts which closed on January 31, 2023 for which a “Feedback on a Conceptual Policy What We Heard Report” is posted on the Jasper National Park Public Notices webpage.
Conceptual policy change feedback and subsequent actions
The table below contains the 8 Conceptual Changes that were consulted on, general public feedback, and the subsequent Parks Canada Action.
Concept | Issue | Proposed change | Public feedback and subsequent Parks Canada action |
---|---|---|---|
Kitchens prohibited in PHAs | Kitchens were inferred as not being acceptable in a PHA as a dwelling may only have one Kitchen and a PHA is an area within a dwelling. Kitchen is defined in policy and one of the defining elements includes an area used for the preparation of food. There has been confusion regarding what appliances, or cupboards, are permitted in a PHA. | Kitchens located in a PHA shall be expressly stated as prohibited, with the exception of a PHA located in a Secondary Suite approved by a Parks Canada Development and Building Permit process. A beverage preparation area (may include sink, mini fridge, one upper / lower standard cabinet, microwave, kettle, coffee maker) for all residential dwellings is acceptable if accompanied by an attestation declaring the preparation of food will not be facilitated. |
|
PHA Gross Floor Area (GFA) definition and limitation | PHAs currently are defined in policy as PHA Bedroom(s) whereas most PHA Areas also include a bathroom, sitting room, exterior entrance and other areas. The policy currently limits the floor area of Home-Based Businesses (which include PHAs) to 10%, where applicable, but does not clarify if this is applicable to PHAs. PHAs are listed as a secondary use in a dwelling, but should not have an area larger than the remaining residential space in the dwelling. | The definition of PHA Area (including bedroom, bathroom, sitting room, exterior entrance and other areas associated with the PHA) will be added and it will be clarified that it is limited to a maximum of 45% of the dwelling unit’s Gross Floor Area. | Public Feedback Supportive; therefore, Parks Canada will propose an amendment to the Policy which will include the Private Home Accommodation Area definition and limitation to a maximum of 45% of the dwellings gross floor area. |
PHA parking (not obstructed) | Current Policy states that additional on-site PHA parking stalls are required, in addition to the site’s required on-site parking, but does not state the PHA Parking stall(s) must not obstruct each other or the other required on-site parking of the site. In practice this has made it functionally difficult to ensure a site is using its required parking spaces to lessen the impact on the public street parking. | Clarification that PHA on-site parking stalls may not block (tandem parking) each other or other on-site required parking stalls. For properties with no lane access, PHA parking stalls may still be located in the front setback, provided they are not in tandem with other required on-site parking stalls or at the expense of required soft landscaping. | Public Feedback Not Supportive of prohibiting tandem parking; therefore, Parks Canada will not propose an amendment restricting Tandem Parking. |
PHA on-site parking use | The current Policy requires a PHA to provide additional on-site parking (one on-site parking spot per PHA Bedroom) but does not state that the additional PHA on-site parking stall is to be used by the PHA guests. | The Policy will be amended stating that PHA operators are responsible for their PHA guests to use the on-site PHA parking stalls. |
|
PHA discretionary use DU 3-year term | Previous public consultation specific to PHAs suggested compliance inspections should be conducted on a regular basis rather than on the current complaint basis. | New PHA Discretionary Use permits will be issued for a maximum term of 3 years. Upon expiry, a new permit must be obtained, demonstrating compliance with all requirements. A PHA Compliance Policy for existing PHAs, that have no permit expiry date, will also require an inspection every three years. |
|
Compliance inspections | Current Policy has a specific PHA requirement for compliance issues to be rectified within 60 days. This has been problematic to enforce and is inconsistent with the general compliance Policy for all other permits including other home based businesses. | Removal of this PHA-specific compliance deadline will align it with the existing permit compliance policy. |
|
Restriction of: Maximum 2 exterior entrances per dwelling Exterior stairway to second floor Enclosed entrance hallway Independent access to basement |
PHA operators have identified that having an independent PHA entrance is a key component to the offer for safety and convenience. Continuing to restrict other home owners, except PHA operators, does not seem to be fair and equitable. | Remove restriction and require an attestation to ensure independent exterior access will not be used for a non-approved dwelling. | Public Feedback Supportive; therefore, Parks Canada will propose an amendment to Policy removing these exterior entrance restrictions. |
Discretionary use permit | Current policy considers a Development Permit as the approval for either a Development (physical construction) or a Discretionary Use (use). The requirements for these types of permits are very different and this has caused confusion. | Addition of Discretionary Use Permit definition distinguishing it from a Development (physical construction) permit. | Public Feedback Supportive; therefore, Parks Canada will propose an amendment to the Policy adding the Discretionary Use Permit. |
Next steps
Parks Canada will prepare and submit a Town of Jasper Land Use Policy amendment package to the Planning and Development Advisory Committee (PDAC). The policy amendment package will also contain several policy clarifications that do not represent a change in policy direction rather are intended to provide policy clarity. The Parks Canada PDAC Application will follow the standard PDAC process: public hearing information will be advertised in the Fitzhugh newspaper, and the application package will be available for review on the Jasper National Park Public Notices. PDAC meetings are open to all and provide a formal public hearing process. Anyone affected by a development being considered by the committee may ask to speak at the public hearing. Information on how to participate in a PDAC meeting may be found here. Following the meeting, the PDAC will submit written recommendations to the Jasper Field Unit Superintendent.
The PHA land-use policy amendment package is expected to be on the agenda of the March 22, 2023 PDAC meeting. Public notices of upcoming PDAC meetings and agenda items are published on the Jasper National Park website and in the Fitzhugh newspaper a minimum of two weeks in advance.
When will the policy changes take effect?
Pending the outcome of the PDAC meeting, Parks Canada anticipates the PHA land-use policy amendments being completed by March 31, 2023, and to resume accepting new PHA permit applications shortly thereafter.
What We Heard – Jasper Zoning Regulations and Housing
Thank you for your participation in our Public Consultation on March 14, 2019 on zoning and Accessory Dwelling Units.
Your feedback and ideas have been compiled into a What We Heard Report, which can be accessed here.
We appreciate your participation and contribution to these important regulations and policies.
Stay tuned for more information in the coming months on our website.