Bulletins
Trent-Severn Waterway National Historic Site
Temporary Closure of Lift Lock Tunnel in Peterborough for Embankment Work
Issued: May 27, 2026
Ends: June 02, 2026
Peterborough, Ontario, May 27, 2026 – Parks Canada wishes to advise visitors and residents of a temporary closure of the Lift Lock Tunnel on Hunter Street East in Peterborough to allow for work on the embankment, immediately east of the tunnel.
The Lift Lock Tunnel will be closed to vehicular traffic from 9:30 a.m. to 12:00 p.m. on Monday, June 1, 2026.
During the closure:
- A signed detour route will be in place.
- Traffic control personnel will be on-site to assist with the movement of emergency services vehicles, transit buses, and heavy trucks.
- Motorists should expect delays and are encouraged to plan their travel accordingly.
If you would like to learn more about the infrastructure work happening in Peterborough, including the replacement of the Maria St. Bridge this fall, visit parkscanada.ca/Peterborough.
Parks Canada appreciates the public’s patience and cooperation while this work is completed and apologizes for any inconvenience.
- Date modified :